Construction Of Reinforced Concrete Columns In Wooden Mold, Height: 4 M To 4 M, Perimeter To 2 M, Natural Sand For Construction Work, Manually Filling The Trenches, Pits And Holes, Group Of Group: 3, Hand-Drilling In Sloped Trenches In Sloped Trenches Up To 2 M, Group Of Group: 3 (), Setting The Stains And Poles: Concrete, Group Of Ground: 2, Demolition: Walls From Small Blocks (Demolition Of The Wall From The Whole Stone), Construction Of Six Basics: Sandy, Establishment Of The Foundation Of The Tape: Iron Concrete, When The Upper Side Is Up To 1000 Mm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.