GTR 97846849

Tenders Are Invited For The Addition Of Street Lighting In Widełka - Majdan Part. Iv

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
97846849
Tendering Authority
Subscribe to view
Tender No
ZP.271.1.12.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For The Addition Of Street Lighting In Widełka - Majdan Part. Iv
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
26-06-2025 Closed
Work Detail
1. The Subject Of The Contract Is The Implementation Of Construction Works On The Tasks Of Iv2. Construction Of A Segment Of The Street Lighting Network (According To O7 Documentation To O11), Powered From The Built O6 Column, Asxsn 2X35 Mm2 Cable, Suspended On 5 10.5 M Vertic Pillars With A Height Of 10.5 M, Erected Directly In The Ground Together With Secular Plates, With A Length Of Approx. 260 M. 3. On The Pole O11 You Need To Mount The Revolution Ω. 4. Led Luminaires With A Light Stream Min. 7140 Lm, Mounted On Tubular Booms Planted On A Rotated Poles. 5. Road Led, Two -Chamber Luminaires With Factory -Installed Nema 5/7 Pin Sockets With Lighting Controllers. 6. The Marking Of The Poles Should Be Agreed With The Investor. 7. The Lighting Control Must Be Compatible With The Existing System Used In The Kolbuszowa Commune. 8. Isc Sp. Z O.O., Ul. Krakowska 140A, 34-120 Andrychów. 9. The Task Should Be Reported For Pickup To Pge Dystrybucja Mielec Energy Region And Completed With A Positive Reception. 10. Minimum Requirements Of Led Luminaires) Two -Chamber Housing Made Of Pressure Aluminum Casting, Tempered Glass With Self -Cleaning Coating, Scratch -Resistant) Powder Painted Body, With Electrostatic Coating, C) Luminaire Made In The 2Nd Class Of Anti -Tire Protection), The Luminaire Chamber And The Ip 66 -Tightness. Equalizing Pressure, E) Impact Resistance - Ik 08F) The Color Temperature Of The Diodes Used In The 3800K Range - 4200K G) The Setting System For Controlling The Analog Signal 0 -10 V H) Power Reduction (Stream) Must Take Place Fluently By Reducing The Lighting Stream Of All Led Sources At The Same Time And Not By Turning Off Individual Led Panels In One Lifting And) Luminaires (Taking Into Account All Losses) Min. 170 Lm/Wj) Power Coefficient (Cos Φ) ≥0.98 For The Rated Power, Maintenance Of The Cos Φ Power Factor Above 0.96 When Controlling The Binding In The Range Of 20-100% Of The Rated Power) Resistance Of The Luminaire To Overvoltage: 10 Kv.L) In The Range -150 To +150, Jumping Every 50 M) Luminaire Equipped With A Nema 5/7Pin Socket, N) Has Valid Certificates: Ce, Rohs, Enec, Enec +O) Guarantee Min. 5 Years (60 Months) From The Date Of Receipt Of Works. 11. Before Building, The Proposed Materials (Regarding Lighting Fittings) Should Be Approved For Approval By The Contracting Authority, Based On Catalog Cards And Certificates. 12. The Deadline For Switching On The Network Section Should Be Coordinated With The Contractor Of The Previous Section.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
68a821a7-0e79-4323-bcd1-87a5ae3a2978.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders