Tenders Are Invited For Construction Work - Water Supply Sörenberg: Measures Set Sources. Board Construction Set - Obersörenberg - Reservoir Village (Master Builder And Pipeline)
Tenders Are Invited For Construction Work - Water Supply Sörenberg: Measures Set Sources. Board Construction Set - Obersörenberg - Reservoir Village (Master Builder And Pipeline)
Construction Work - Water Supply Sörenberg: Measures Set Sources. Board Construction Set - Obersörenberg - Reservoir Village (Master Builder And Pipeline). The Source Derivation Set - Reservoir Village Is Replaced By An Earth -Laying Pressure Line Dn 150Mm. The New Pressure Line Made Of Ductile Casting Tubes, Full Protective Tubes On The Outside With A Cement Mortar Wall And On The Inside With A Cement Mortar Lining, Is Created With Formal, Highly Resilient Plug-In Compounds And The Hydroelectric Potential For Electricity Production In The Obersöreberg Drinking Hydration Power Plant. In The Present Case, The Master Builder Work And The Pipeline Construction Work Will Be The Overall Package For The Tender. The Source Dissipation Extends Over A Height Difference Of Around 300 Meters Of Altitude With A Line Length Of Approx. 1200M. In Addition, The Creation Of The Hdpe 125/102.2Mm Pumping Line, Length Approx. 120M From The Preparation Building In Obersörenberg To The Reservoir Village And The Freefiegel Overflow Line From The Preparation Building In Obersöneberg Are Also Advertised.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.