GTR 97649802
Tenders Are Invited For Construction Work - Selection Of A Contractor For Engineering (Design, Construction And Copyright Supervision) For Energy Renovation Of Multi -Family Residential Buildings On The Territory Of Burgas In Connection With The Procedure Support For Sustainable Energy Renovation Of The Residential Building - Stage I For Building Administrative Address: Burgas, Sofia. Slaveykov Bl. 13 ”
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
97649802
Tendering Authority
Subscribe to view
Tender No
358611-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Selection Of A Contractor For Engineering (Design, Construction And Copyright Supervision) For Energy Renovation Of Multi -Family Residential Buildings On The Territory Of Burgas In Connection With The Procedure Support For Sustainable Energy Renovation Of The Residential Building - Stage I For Building Administrative Address: Burgas, Sofia. Slaveykov Bl. 13 ”
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
17-07-2025
Closed
Work Detail
Construction Work - Selection Of A Contractor For Engineering (Design, Construction And Copyright Supervision) For Energy Renovation Of Multi -Family Residential Buildings On The Territory Of Burgas In Connection With The Procedure Support For Sustainable Energy Renovation Of The Residential Building - Stage I For Building Administrative Address: Burgas, Sofia. Slaveykov Bl. 13 ”. The Building Subject To This Procurement Should Be Designed And Implemented All Energy -Saving Measures That Are Prescribed As Binding On The Respective Buildings In The Energy Efficiency Survey; All Mandatory Measures For The Constructive Strengthening Of The Building, Prescribed In The Technical Inspection, And To Provide And Implement The Necessary Measures To Ensure An Accessible Architectural Environment In Accordance With The Current Regulatory Framework. In Compliance With The Measures Proposed In The Energy Efficiency Survey, The Most Effective Package Of Energy-Saving Measures For The Building, Which Achieves The Regulatory Requirements For Energy Efficiency, Has Been Selected. Multifamily Residential Building With Administrative Adrs: Burgas, Zh.K. Slaveykov Bl. 13 Has Identifier 07079.602.319.1 Under The Cccr Of Burgas. The Multi -Family Residential Building Category Iv / Fourth / Category Within The Meaning Of Art. For The Nomenclature Of The Types Of Construction And Is Privately Owned. The Building Has An Identifier 07079.602.319.1 According To The Cckr Of Burgas And Is Located In Burgas, Sofia. Slaveykov Bl. 13. The Building Has A Total Area Of Zut 15 619,64 Sq.M. The Building Was Put Into Operation In 1967. The Building Is Constructed According To The Ecss Structural System-Unscrupulous-Panel. It Consists Of Eight Entrances With Eight Residential Floors And Basement. The Large -Panel Residential Buildings Are Fully Made Of Reinforced Concrete Panels - Floors, Walls, Staircases And More. Each Element Is Prepared In Factory Conditions Under A Certain Nomenclature. The Connection Between The Individual Panels Is Made By Doweling Connections, Through The Welds Of The Steel Connections In Advance, And Subsequently, They Are Coated With Cement Solution. The Facade Wall Panels Are 20 Cm Thick. The Outer Basement Walls Are Monolithically Executed. Interior Partition Walls Of Brickwork Are Also Observed. Reinforced Concrete Railings Are Mounted On The Terraces, Gripped To The Floor Panel By Steel Profiles. The Roof Is Reinforced Concrete, Type Flat Roof With Attic Space, Consisting Of An Attic And Roof Plate With A Thickness Of The Air Layer Between Them Greater Than 30 Cm. Access To The Roof Is Made Through An Opening In The Attic Plate Of The Staircase. Rainwater Drainage Is External Through Gutters And Gutters. The Floor Of The Heated Part Of The Building Borders Both With An Unheated Basement Floor And With Outside Air (Bachelor). In The Basement Level There Are Warehouses, Corridors And Common Rooms That Are Partially Underground. The Total Number Of Apartments In The Building Is 192. During The Period Of Operation Of The Building, Construction And Repair And Other Activities Were Carried Out. The Repair Activities, Reconstructions And Change Of Finishing Materials Were Partial At A Different Period Of Operation Of The Building. There Are Also Parts Of The Building That Have Not Been Renovated Throughout Its Operational Period. The Joinery Has Been Replaced An Hour
Key Value
Tender Value
3,255,520 - BGN
Tender Documents
Global Tender Document
fb694bfd-8a95-43d7-a9af-4b761e882fac.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.