Demolition Work - Non -Constructive Demolition, Disassembly, Pollutant Renovation Employee Building 2. The Employee Building 2 Is Part Of The Original Building Stock Of The Campus Of The Former Educational University. The Building Ensemble Was Protected As A Whole In The Early 1990S And Included In The Monument List Of The Free State Of Thuringia As Cultural Monuments. The Building Was Built Between 1955 And 1958. It Consists Of A Basement, Three Full Floors And A Subsequently Developed Attic. The Floor Plan Dimensions Are Approx. 57.7 M X 12.7 M With A Eaves Height Of Approx. 10.5 M. The House Is Only Partially Lower Cellar. An Area Of The Basement Was Trained As A Deep Cellar To Accommodate The Construction Period. The Outer Walls On The Basement Are Made Of Stamped Concrete. All Other Load -Bearing Walls Of The Building Were Built With Bricks In The Masonry Building. The Building Structure Is Fundamentally Determined By The Longitudinal Wall Construction. The Ceilings Store On The Outer And Hallway Walls And Tension In The Building Superiority. These Are Filler-Body Rib Ceilings (Steel Stone Ceilings) Mainly Designed In The Construction Of The Wenko Ceiling. Local Place Concrete Areas Or Reinforcements Are Available. The Floor Heights Are Approx. 3 M On The Regular Floors. The Upper Building End Forms A Hipped Roof With 34 ° Roof Pitch In Brick Covering. It Consists Of A Room-Mandatory Compartment Construction With A Double-Standing Chair, Which Takes Over Two Explosive Plants In A Grid Of 3.45 M To The Hallway And Outer Walls. The Content Of The Service Description Are Building-Preparing Demolition And Disassembly Work Of The Modern Surfaces As Well As The Removal Of Pollutants. The Renovation Area Is Free And Cleared. The Dismantling Only Affects Non -Constructive Components. Load -Bearing Components, The Components Or Chimneys That Are Not Approved By The Planning Must Not Be Canceled. The Building Control Systems Must Be Completely Demolished, It Must Be Ensured That The Main Supply Lines (District Heating, Lwl, Cu-Ring) Are Not Damaged In The Basement. The Services To Be Carried Out By The Contractor In Particular Include The Following Measures: · Pollutant Rehabilitation According To Trgs · Determination Work In Accordance With The Requirements Of The Object And Specialist Planners · Professional Disposal Of All Waste That Occurs In The Above Measures · Documentation Of The Renovated Areas And Professional Disposal
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.