Tenders Are Invited For Reconstruction Of The Water Reservoir With The Construction Of A Venture Building On Journal Of Laws No. 616/11 Precinct 0002 Borkowice Commune Borkowice
Tenders Are Invited For Reconstruction Of The Water Reservoir With The Construction Of A Venture Building On Journal Of Laws No. 616/11 Precinct 0002 Borkowice Commune Borkowice
The Subject Of The Investment Is The Implementation Of The Investment Task: Reconstruction Of The Water Reservoir With The Construction Of A Discount On Journal Of Laws 616/11 Precinct 0002 Borkowice Borkowice Commune. The Reconstruction Is Aimed At Increasing The Total Surface Of Fc = 4252.00 M2, Including The Surface Of The Water Mirror Flw = 4040.00 M2 And Capacity V = 8080.00 M3. The Water Reservoir Will Be Equipped With A Drop Building And An Inlet Ditch Supplying Water To The Water Reservoir. List Of The Area Of Individual Parts Of The Plot: - Total Area Of The Plot - 4.4966 Ha, - Area Intended For The Reconstruction Of The Tank - 0.7477 Ha, Including: - Total Area Of The Tank - 0.4252 Ha, - Area Of The Island In The Tank - 0.0212 Ha, - Water Mirror Area - 0.4040 Ha, - Area Of The Communication Belt - 0.1425 Ha, Green Development - 0.1800 Ha, - The Remaining Area - 3.7489 Ha. The Specific Elements Of The Water Reservoir Will Be Performed As Follows: A) Preparatory Works - The Surroundings Of The Tank Should Be Cleaned Of Lichen, Bushes And Trees. The Water Reservoir Should Be Emptied By Pumping Out The Water, Make A Working Cinenette To Drain The Water From The Tank To Drain The Silt In The Bottom Of The Tank And Preparation For Putting Down And Export. B) The Tanks Bowl Will Be Cleaned And Mechanically Deepened, With A Salad Or Germ Excavator For The Purpose Of Draining The Emitted Soil. After Mining And The Ground, The Bottom Should Be Leveled Under The Cover Of Surface Drainage. C) The Cracks Should Be Formed Mechanically, With Thickening. Finishing Works On The Slopes Do Manually, Arrange A Geocrat And Fill With A Natural Stone With Clinicing. After Forming The Islands Embankment, Its Surface Should Be Covered With Drained Soil From The Bottom Of The Tank And Then The Strengthening Of The Slopes) Should Be Made As A Prefabricated Plant. The Sections Of The Sunbed Pipeline Should Be Combined In The Excavation. The Pipeline Should Be Adopted By The Discount Of The Ventilation Building. Working Of Works For The Entire Construction Intention. A) Preparatory Works.B) Earthworks - Cleansing The Bowl Of The Tank From The Soverteak And Deepening Of The Canopy.C) Earthworks - Land Deportation From The Tanks Bowl. Geocrats With Stone Filling, F) Assembly Works - Construction Of A Compulsory Building. G) Development Of The Tank Surroundings With Greenery. A Hedge From Cisah) Hiking Belt Made Of 6 Cm Thick Concrete Cobblestones And A Width Of 1.20 M, On Cement And Sand Bedding 5 Cm Thick. The Contracting Authority Does Not Allow The Possibility Of Submitting Partial Offers. The Prophecy Should Include The Implementation Of The Entire Order. Robots Should Be Carried Out In Accordance With The Design Documentation, Technical Specification And Receipt Of Construction Works, In Accordance With Construction Art And Applicable Norms And Legal Regulations. The Order Of The Contract Was Described By Design Documentation With A Preface Of Works -
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.