GTR 97510690
Tenders Are Invited For Thermomodernization Of The Primary School In Brzeźnica
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
97510690
Tendering Authority
Subscribe to view
Tender No
GKM.271.2.2025,MG
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Thermomodernization Of The Primary School In Brzeźnica
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
18-06-2025
Closed
Work Detail
5.1. The Subject Of The Public Procurement Procedure Is Thermomodernization Of The Primary School In Brzeźnica 5.2. The Remuneration Must Take Into Account All The Costs Necessary To Meet The Full Scope Of The Subject Of The Contract Specified In Swz And Attachments To Resulting Directly From Swz And Attachments To Swz, As Well As All Other Works Necessary To Perform And Properly Exploit The Subject Of The Contract, Including Those Resulting From Geological Conditions And Other Described In The Documentation. 5.3. The Detailed Scope Of Works Is Specified In Particular: Construction Projects, Bills; Technical Specifications For The Execution And Acceptance Of Works (Construction, Electrical, Sanitary Industries) 5.4. Attention! The Construction Site Is Located In A Constantly Functioning School. Works Should Be Performed In A Way That Allows The Facility To Be Functioned With Particular Caution Due To The Students And Employees Of The Facility Staying There. In Particular, Appropriate Protection And Marking Of The Area Of Works Should Be Used. Before Starting Work, Please Inform The Facility In Advance About The Exclusion Of Individual Rooms From Use. 5.5. The Subject Of The Contract Includes The Performance Of All Works And Activities Necessary For The Proper Implementation Of The Contract In Fact In The Material Scope In Particular In The Construction Design, Technical Specifications Of The Execution And Acceptance Of Works And In The Preface (The Bill Of Quantities Should Be Treated As An Auxiliary Element). 5.6. The Contractor Is Obliged To Thoroughly Check And Estimate The Amount Of Required Works With Project Documentation. Due To The Fact That The Remuneration For The Implementation Of The Contract For The Work Is A Flat -Rate Nature, In The Event Of A Larger Amount Of Measurement Of Specific Works Included In The Project In Any Preliminary Item During The Works, It Will Not Be Able To Be Considered Additional Robots With An Additional Remuneration. An Possible Lack In The Pre -Emptive Of Works Necessary To Perform Resulting From The Project Documentation Failure To Dismiss The Contractor From The Obligation To Perform Them On The Basis Of The Project At The Contractual Price. In Connection With The Above, The Contractor May Not Refer To Any Deficiencies In The Prejudice And Based On Them To Demand An Increase In Remuneration. In The Event Of A Discrepancy Between Individual Elements Of Project Documentation, The Contractor Is Obliged To Apply For The Employer For Clarification Before Submitting The Offer, Because As Part Of The Remuneration Given In The Offer, The Contractor Is Obliged To Perform All The Necessary Works Provided For In Any Of The Documents Constituting An Attachment To Swz. The Contractors Offer Should Include All Necessary Works Ensuring The Performance Of The Subject Of The Contract. 5.7. The Contracting Authority Recommends That The Contractor Takes A Local Vision At The Investment Site Before Submitting The Offer And
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
933de853-95e1-4486-bf15-3494bf09d44e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.