Sewage Treatment Works - Municipality Of Borač - Wwtp And Sewer Ii. The Subject Of The Public Contract Is Sewerage For The Municipality Of Borač. Sewage Waste Water Will Be Drained Via A Built Hundred Network On A Newly Built Wwtp (For 500 Eo) In Borač. The Sewer Networks Will Be Made Up Of New Sections Of Sewage Gravitational Sewerage, Pressure Sewage And Sewerage Connections. The Sewer Network Will Have A Total Length Of 6,882.0 M, The Public Part Of The Sewer Connections 690 M. There Are 6 Pumping Stations With Solids Separation On The Pressure Sewer. It Will Also Be The Subject Of The Construction Of 9 House Petrol Stations (Wet Sumps). As Part Of The Construction Of The Construction, Approximately 9 M Sewerage Will Be Built Trenchlessly Using Horizontally Controlled Pastes And About 96.1 M Using Worm Drilling. Part Of The Subject Of Performance Is Also The Provision Of Trial Operation Wwtp For 12 Months. The Subject Of The Public Contract Is Described In Detail In The Project Documentation For The Award Of The Public Contract For The Construction Municipality Borač - Wwtp And Stoková Network Processed By Provod - Engineering Company S.R.O., In Podhájí 226/28, 400 01 Ústí Nad Labem, Id No. The Construction Municipality Of Borač - Wwtp And Sewer Network Is Allowed By Decision Of 9.1.2023 Under File No. S-Muti 40795/2022/Ožp/Krp. This Decision Came Into Force On 21.2.2023.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.