Structural Shell Work – Baumeisterarbeiten. Concrete, Reinforced Concrete And Insulation Work: Set Up And Maintain The Construction Site (Toilet And Meeting Container, Construction Current, Construction Water, Etc.), Reinforced Concrete Floor Plate D = 30 Cm, Base Area 1,220 Sqm With The Surrounding Unexpected Frost Apron And Wu House Input Shaft On A Load-Bearing Foam Glass Pattern Insulation (D = 54 Cm, 628 Cbm) Produce. Foundation Is Founded On The Start -Up Sole Created. Delete And Install Back Filling Of Work Rooms Under The Floor Slab, Foundation Earth And Earthing System.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.