2. Work Related To The Construction Of The Water Intake Will Be Carried Out In The Design And Build Mode. The Order Includes Designing, Obtaining The Decisions And Permits Required By Law, As Well As The Construction And Commissioning Of The Subject Of The Contract. As Part Of The Order, All Necessary Design Studies Should Be Made Along With The Necessary Opinions And Technical Conditions, Obtain All Arrangements, Permits, Permits, Decisions And Consent To Perform The Contract On Behalf Of And For The Contracting Authority. The Task Includes The Construction Of A Water Treatment Plant On The S4 Approach With Necessary Technical Equipment. The Planned Capacity Of The Shot Will Be: Quzd = 49.0 M3/H, Qmaxd = 1000.0 M3/D. The Scope Of Work Includes In Particular: - Execution Of The Well No. S4 With The Housing, Armament And Inclusion In The Transit Pipeline, - Construction Of A 49M3/H Technological System With A Set Of Reserve Devices, - Implementation Of Installations: Electrical Installations And Monitoring Of The Work And The Surrounding Area. Power -Generating The Facility With Automatic Start -Up, - Construction Of A 38 Kva Pole Transformer Station, - Construction Of A Chloride Building, - Construction Of Water Tanks, - Demolition Of Existing Facilities. The Science List Of Works Necessary For Execution Was Presented In The Attachments To Pfu. The Provided Parameters Of The Road And The List Of Works Are Illustrative, And All The Differences That Will Result During The Development Of A Construction Project And The Executive Project By The Contractor Will Not Affect The Contract Price And The Time Of Completion Of Works. In The Calculation Of The Costs Of Performing The Contract In Question, All Costs Should Be Taken Into Account, Including The Costs Related To The Marking Of Works According To The Project Prepared In Accordance With The Marking Instructions. The Values Attached To Swz Are An Example Of The Scope Calculation And Cannot Be The Only Basis For Calculating The Price Of Performing The Entire Subject Of The Contract. The Price Presented In The Offer Is Payment For Works Carried Out And Completed In Every Respect, To The Extent Necessary For The Proper Performance Of The Subject Of The Contract. The Detailed Scope Of The Subject Of The Contract Is Included In Annex 7 To Swz. Detailed Terms And Scope Of The Order Are Specified In The Contract Template (Annex No. 6 To Swz). The Above Documents Constitute An Integral Part Of Swz. Mount The Materials Indicated In The Bill Of Quantities Or Equivalent. If Trademarks, Patents, A Managing Origin Allow Equivalent Solutions In Each Case In The Tender Documentation. Building Materials Used To Perform The Subject Of The Contract Must Meet The Requirements Of Art. 10 Of The Act Of July 7, 1994. Construction Law. The Contractor Who Refers To Equivalent Solutions Is Obliged To Show That The Materials He Offers Meet The Requirements Set By The Contracting Authority.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.