GTR 97310513
Tenders Are Invited For Engineering Services - General Planner Performance For The Construction Of A Further Preparation System For Drinking Water Supply
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
97310513
Tendering Authority
Subscribe to view
Tender No
348843-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Services - General Planner Performance For The Construction Of A Further Preparation System For Drinking Water Supply
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
30-06-2025
Closed
Work Detail
Engineering Services - General Planner Performance For The Construction Of A Further Preparation System For Drinking Water Supply. The Aabach Valley Water Association As A Corporation Under Public Law Operates The Aabach-Vallersperre For The Local Authorities District Of Warendorf, District Of Gütersloh, District Of Soest, District Of Paderborn. The Annual Drinking Water Tax Is Approximately 11 Million M³. The Drinking Water Treatment Capacity Is 2,800 M³/H Or 67,000 M³/D. The Dam Has A Capacity Of 20.5 Million M³, Whereby The Congestion Is 17.48 Million M³ And The Approved Raw Water Withdrawal Amount Is 11.4 Million M³ In Accordance With The Planning Approval. Since Commissioning, No Significant Optimization Measures Or Conversions Have Been Carried Out On The System Technology. Since The Beginning Of 2017, The Water Association Has Been Intensively Dealing With The Optimization And Further Development Of The Water Treatment Plant. Various External Influences, Such As The Aging Of The Dam And Changes In The Catchment Area (E.G. Forest Calamity, Climatic Changes, Increased Temperature Fluctuations And Increased Precipitation Intensities), Require A Review And Adaptation Of The Existing Processing Techniques According To The State Of The Art To Ensure A Secure Drinking Water Supply And The Operation Of The System Technology In The Long Term. To Improve Drinking Water Treatment, An Ultrafiltration System (Uf) With Upstream Floccup Was Decided And To Implement Various Accompanying Measures To Convert And Modernize The Existing Systems. These Measures Are Summarized As A Project For Further Preparation System (Shortly For Short). The Subject Of This Negotiating Procedure With An Advanced Participation Competition Is The Allocation Of General Planning Services For The Construction Of The Waa For Drinking Water Supply Including Additional Services. The Aim Is To Plan, Prepare/Participate In The Allocation, Object Monitoring And Object Supervision Of The Construction Of The Waa By The General Planner. The Contract Is To Be Commissioned By Step, Divided According To The Following Performance Phases: - Level 1: Power Phases 1 - 3 - Level 2: Performance Phases 4 - 5 - Level 3: Performance Phases 6 - 7 - Stage 8 - 9 The Client Reserves The Right To Be Provided By The Contractor In The Course Of The Project. To Limit Stages. In Addition, The Scope Of Services Can Be Further Limited In The Individual Work Packages After Completion Of Level 1. In The Following, The Detailed Scope Of Services Of The Contractor According To The Hoai Performance Phases And Work Packages Is Shown: 1. Work Package: Raw Water Pumping Unit Or Establishment New Raw Water Pumping Station Performance Image: Object Planning Engineering Structure; Specialist Planning Structure Planning; Specialist Planning Technical Equipment Hoai Lph 1-9 2. Work Package: New Establishment Uf (Incl. Rinse Water Treatment, Including Laboratory Rooms) Performance: Object Planning Engineering Structure;
Key Value
Tender Value
4,500,000 - EUR
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.