GTR 97256125
Tenders Are Invited For Construction Of 50Ml/D Highbury Water Treatment Works & Raw And Clear Water Pumpstations: Mechanical & Electrical
ICB — International Competitive Bid
Closed
Africa
Tender Information
GTR Reference
97256125
Tendering Authority
Subscribe to view
Tender No
ORTDM SCMU 43-24/25
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of 50Ml/D Highbury Water Treatment Works & Raw And Clear Water Pumpstations: Mechanical & Electrical
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Africa
Political Region
BRIC,G20,African Union
Last Date of Bid Submission
03-07-2025
Closed
Work Detail
Tenders Are Invited For Construction Of 50Ml/D Highbury Water Treatment Works & Raw And Clear Water Pumpstations: Mechanical & Electrical 1.1 Sans 1200A 8.3 Scheduled Fixed Charge And Value Related Items 1.1.1 8.3.1 Contractual Requirements Sum 1 1.1.2 Pi 14 Main Contractors Costs For Management And Establishment And On-Site Supervision Of Local Smmes Carrying-Out Ring-Fenced Civil Works At Commencement Of Contract Before Needing To Establish Facilities For Own Installation Works. Sum 1 8.3.2 Psab 8.2.1 To 8.2.9 Establishment Of Facilities On Site For Installation And Commissioning Stages: 8.3.2.1 1) Facilities For Engineer (Sans 1200 Ab) As Amended In Psab - From Commencement Of Local Subcontractor Civil Works To Start Of Trial Operating Period) 1.1.3 A) One Furnished Office Sum 1 1.1.4 B) Meeting Room Sum 1 1.1.5 C) Nameboard (1 No.) Sum 1 1.1.6 D) Covered Parking Bays (2 No.) Sum 1 1.1.7 G) All Other Specified Facilities (Incl Wifi Internet Connection, Printer And 1 Hired Vehicle) Sum 1 8.3.2.2 2) Facilities For Contractors 1.1.8 A) Office And Storage Sheds Sum 1 1.1.9 B) Workshops Sum 1 1.1.10 C) Laboratories Sum 1 1.1.11 D) Living Accommodation Sum 1 1.1.12 E) Ablution And Latrine Facilities Sum 1 1.1.13 F) Tools And Equipment Sum 1 1.1.14 G) Water Supply, Electric Power And Communications. Sum 1 1.1.15 H) Dealing With Water (Sub-Clause 5.5) Sum 1 1.1.16 I) Access (Sub-Clause 5.8) Sum 1 1.1.17 J) Plant Sum 1 1.1.18 K) Security And Fencing And Hoarding Sum 1 Carried Forward 50Ml/D Highbury Water Treatment Works And Raw & Clear Water Pumpstations: Mechanical & Electrical 1 Preliminary And General 89 Contract: Ortdm Scmu 43-24/25 Bill Of Quantities Contract Title: Section: Item Payment Refers Description Unit Quantity Rate R Amount R Brought Forward 1.1.19 8.3.3 Psa 8.2.1 General Responsibilities And Other Fixed Charge Obligations (Including Making Allowance For Effects And Payments Taking Up To 60 Days From Date Of Invoice) Sum 1 Oh&S - Fixed Charges 1.1.20 1A) Oh&S Documentation Sum 1 1.1.21 1B) Entry Medicals For All Workers Sum 1 1.1.22 1C) Provision Of Ppe And All Other Protective Clothing Incl All Covid Prevention Measures Sum 1 1.1.23 1D) Signage (Warning, Hazard Etc) Sum 1 1.1.24 1E) Staff Training Sum 1 1.1.25 1F) First Aid Sum 1 1.1.26 1G) All Other Items Sum 1 1.1.27 2) Completing And Checking The Project H&S File And Handing Over The Client On Completion Of The Works And Exit Medicals For All Workers Sum 1 1.1.28 3) Provision Of Hiv/Aids Awareness Plan And All Necessary Fixed Charge Items To Achieve Compliance With Sans 1921 Part 6 Hiv/Aids Awareness Sum 1 Environmental- Fixed Charges 1.1.29 Psa 8.11 Fixed Charges Associated With Complying With The Environmental Management Plan Sum 1 Disestablishment 1.1.30 8.3.4 Partial Removal Of Engineers And Contractors Site Establishment On Completion Of Works At Transition From Commissioning To Start Of Trial Operating Period Sum 1 1.1.31 Removal Of All Remaining Site Establishment At End Of Trial Operating Period Sum 1 1.2 8.4 Psa 8.2.1 Time-Related Items 1.2.1 8.4.1 Contractual Requirements Sum 1 1.2.2 Pi 14 Main Contractors Costs For Management And Establishment And On-Site Supervision Of Local Smmes Carrying-Out Ring-Fenced Civil Works At Commencement Of Contract Before Needing To Establish Facilities For Own Installation Works. Months 8 Carried Forward 50Ml/D Highbury Water Treatment Works And Raw & Clear Water Pumpstations: Mechanical & Electrical 1 Preliminary And General 90 Contract: Ortdm Scmu 43-24/25 Bill Of Quantities Contract Title: Section: Item Payment Refers Description Unit Quantity Rate R Amount R Brought Forward 8.4.2 Operate And Maintain Facilities On Site For The Duration Of On-Site Activities Up To Commencement Of Trial Operating Period 8.4.2.1 1) Facilities For Engineer As Per Psab Clause - From Commencement Of Local Subcontractor Civil Works To Start Of Trial Operating Period) 1.2.3 Psab 3.2 Psab 5.2 A) Furnished Office Sum 1 1.2.4 Psab 3.2 Psab 5.2 B) Meeting Room Sum 1 1.2.5 Psab 3.1 C) Nameboards (2 No.) Sum 1 1.2.6 D) Covered Parking Bays (2 No.) Sum 1 1.2.7 E) All Other Specified Facilities (Incl Wifi Internet Connection, Printer, Monthly Cell Phone Allowance (1 X R500pm) Sum 1 8.4.2.2 2) Facilities For Contractor 1.2.8 A) Office And Storage Sheds Sum 1 1.2.9 B) Workshops Sum 1 1.2.10 C) Laboratories Sum 1 1.2.11 D) Living Accommodation Sum 1 1.2.12 E) Ablution And Latrine Facilities Sum 1 1.2.13 F) Tools And Equipment Sum 1 1.2.14 G) Water Supply, Electric Power And Communications. Sum 1 1.2.15 H) Dealing With Water (Sub-Clause 5.5) Sum 1 1.2.16 I) Access (Sub-Clause 5.8) Sum 1 1.2.17 J) Plant Sum 1 1.2.18 K) Security And Maintaining Fencing & Hoarding Sum 1 1.2.19 Designated Resident Installation Electrician On Site In Full Time Capacity For The Duration Of Onsite Activities; Including All Ancillary Costs Such As Accommodation, S&T, Transport, Laptop Etc Sum 1 1.2.20 8.4.3 Supervision For Duration Of On-Site Activities Sum 1 Psa 8.9 Ps - Ohs Time-Related Charges Associated With Complying With Health And Safety Requirements: Carried Forward 50Ml/D Highbury Water Treatment Works And Raw & Clear Water Pumpstations: Mechanical & Electrical 1 Preliminary And General 91 Contract: Ortdm Scmu 43-24/25 Bill Of Quantities Contract Title: Section: Item Payment Refers Description Unit Quantity Rate R Amount R Brought Forward 1.2.21 1) Cost Of Full-Time Registered Construction Safety Officer On Site (All Costs Associated With Providing A Cso For The Full Duration Of All Onsite, Civil Works By Local Cpg Subcontractors, Installation And Commissioning Activities Sum 1 1.2.22 2) Updating And Amending The Risk Assessments, Safe Work Procedures, The Project H&S File, The H&S Plan, Medicals For All Workers, The Provision Of Ppe And Protective Clothing And Facilities And All Other H&S Matters That Fulfill Ohs Act 85 Of 1993 And Construction Regulation 2014 Sum 1 1.2.23 3) Full Compliance With All H&S Matters During The Construction Of The Works Under The Contract Sum 1 1.2.24 4) Compliance With Sans 1921 Part 6 Hiv/Aids Awareness Plan During The Contract Sum 1 Miscellanious Time-Related 1.2.25 Psa 8.11 Time-Related Charges Associated With Complying With The Environmental Management Plan Sum 1 1.2.26 Liaison And Co-Operation With Employers Staff And Ksd Local Muni Elec Dept Sum 1 Time-Related Charges Over Trial Operating Period 1.2.27 8.4.2 Operate And Maintain Contractors And Engineers Facilities On Site For The Duration Of Trial Operating Period Month 4 1.2.28 All Staffing Costs Associated With Operating The Works 24/7 And Training Ortdm Ops Staff Over Duration Of Trial Operating Period (3 No. Operators @ 8H/Day Each, 7 Days Per Week) Month 4 1.2.29 8.4.4 Company And Head Office Overhead Costs For Duration Of Trial Operating Period Month 4 Time-Related Charges Over Monitoring Period 1.2.30 All Staffing Costs Associated With Monitoring And Assisting Ortdm Ops Staff Over Duration Of Defects Notification Period (1 No. Operator 8H/D, 5D/Week) Month 8 1.2.31 8.4.4 Company And Head Office Overhead Costs For Duration Of Monitoring Period Month 8 Total For Section 1 Carried Forward To Summary 50Ml/D Highbury Water Treatment Works And Raw & Clear Water Pumpstations: Mechanical & Electrical 1 Preliminary And General 92 Contract: Ortdm Scmu 43-24/25 Bill Of Quantities Contract Title: Section: Item Payment Refers Description Unit Quantity Rate R Amount R 2.1 Psa 8.5 Provisional Sum Items Psa 8.5.1 Community Liason Officer 2.1.1 Employment Of Clo For The Duration Of Site Installation (R5000 Pm Plus R300 Pm Cellphone Allowance) Prov.Sum 1 31 800.00 31 800.00 2.1.2 Overheads, Charges And Profit On Item 2.1.1 Above % 31 800.00 2.1.3 Employment Of Psc For Duration Of On-Site Work (6 No. At R500 Pm Each) Prov.Sum 1 18 000.00 18 000.00 2.1.4 Overheads, Charges And Profit On Item 2.1.3 Above % 18 000.00 Compensation Payments 2.1.5 Payments To Local Residents As Compensation As Directed By The Engineer Prov.Sum 1 100 000.00 100 000.00 2.1.6 Overheads, Charges And Profit On Item 2.1.5 Above % 100 000.00 Signage 2.1.7 Signage As Directed By The Engineer Prov.Sum 1 50 000.00 50 000.00 2.1.8 Charges On Profit On Item 2.1.8 Above Item 50 000.00 2.2 Psa 8.6 Prime Cost Items Training 2.2.1 Allowance For Training Of Or Tambo Ops Staff At Registered Courses (Incl Travel Etc) Pc Sum 1 200 000.00 200 000.00 2.2.2 Overheads, Charges And Profit On Item 2.2.1 Above % 200 000.00 Compliance Testing By Engineer 2.2.3 Additional Acceptance Control Testing As May Be Required By The Engineer (Note That The Contractors Tendered Rates Are To Include For All Quality Control Testing Required To Achieve Compliance With The Specifications And That This Scheduled Item Is To Cover Only The Engineers Additional Testing That The Engineer May Require) Pc Sum 1 100 000.00 100 000.00 2.2.4 Overheads, Charges And Profit On Item 2.2.3 Above % 100 000.00 Independant Inspectorate 2.2.5 Independent Inspectorate (Welds, Corrosion Protection) Pc Sum 1 150 000.00 150 000.00 Carried Forward 50Ml/D Highbury Water Treatment Works And Raw & Clear Water Pumpstations: Mechanical & Electrical 2 Provisional & Prime Cost Items & Dayworks 93 Contract: Ortdm Scmu 43-24/25 Bill Of Quantities Contract Title: Section: Item Payment Refers Description Unit Quantity Rate R Amount R Brought Forward 2.2.6 Overheads, Charges And Profit On Item 2.2.5 Above % 150 000.00 Hired Vehicle 2.2.7 Hire Of One Vehicle For The Engineer As Directed (Incl Fully-Comprehensive Insurance & Fuel Costs) Pc Sum 1 600 000.00 600 000.00 2.2.8 Overheads, Charges And Profit On Item 2.2.7 Above % 600 000.00 2.3 Psa 8.7 Dayworks 8.7 Labo Tender Link : Https://Ortambodm.Gov.Za/Tenders/
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b5ae71a8-47cf-4ab4-9f93-33bc40f37025.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.