Construction Work For Gas Pipelines - A9, Section Siders Ost - Leuk/Susten Ost, Move Gas Pipeline, Bauenlos L10162. The Present Submission Includes The Pipe Construction Work, Including The Printing Tests For The Transfer Of The Existing Natural Gas Pipe Rhone Valley (Elr), Route 70 (70 Bar). The Route Of This Extends Over Around 3500M And Runs Parallel To The Trassee Of The Kantonsstrasse T9. The Reallocation Of The Elr Is A Basic Requirement For Enabling The Construction Work Of The A9 Pfyn. The Route Of The A9 In This Area, But Also The Construction Site Slope Is In Conflict With The Existing Elr. Before The Existing Section Of The Line Is Removed, The New Line Section To Be Built Must Be Completed, Checked And Put Into Operation. A Delivery Interruption On The Elr Infrastructure Has To Be Limited To Less Than 24 Hours.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.