Carpentry Installation Work - Carpentry Work 3, Interior Walls Workshops. As Part Of The New Building Of A Professional School Center In Pfarrkirchen, A Four-Storey School Building Made Of Reinforced Concrete Is Required As A Supporting Plate Construction And Four Factory Attachments In A Monolithic Construction Made Of Reinforced Concrete. The Workshop Buildings Are Single -Storey In Sub -Areas And Three -Storey In Partial Areas. The Buildings Are Installed On A Slope. The Excavation Pit Has Already Been Excavated And Construction Work Is Carried Out. Supports Are Planned In Town Concrete, Walls In Town Concrete, In The Facade Area, Parapets From Semi -Finished Parts Between Supports Are Provided Via Individual Concrete Sections. In The School Building, The Reinforced Concrete-Precast Fabric Elements And Tin Elements Are Placed As Cladding In Some Areas. The Floor Slabs Of The School Area And The Workshop Building Are Currently Completed. A Logistics Building, Which Is Also Intended On The Building Site And Partly Taking Place At The Same Time, Was Already Completed In The Shell. The Following Services Are Necessary To Create Drywall In School. Type And Scope Of The Power (Essentially):-Wooden Stand Walls With A Simple Stand 140X100 Mm, Mineral Wool 140 Mm, Planking With 2-Layer 2-Layer 12.5 Mm Gypsum Plates Gf-I-W2-C1, Fire Protection Requirement F0 To F30, Attached To Raw Floor And Construction-On-Road Wood Ceiling: Approx. 3,800 M2-Freestanding Wooden Stand With Double-End Center Plant 2X80x120 Mm, Mineral Wool 160 Mm, Planking With 2-Page 12.5 Mm Gypsum Plates Gf-I-W2-C1, Fire Protection Requirement F30, Fastened To Raw Floor And Side Reinforced Concrete Walls, Led To Under Construction-Based Wooden Ceiling: Approx. 750 M2-Covering Upper Planking Position On One Side With 12.5 Mm Cement-Bound Construction Plates C2 Instead Of Plasterboard Gf-I-W2-C1 From Okrb Up To 1.0 M Above Okrb: Approx. 235 M2-Planking Of The Construction Of The Construction Of Sanitary Installation Walls With 2-Layer 12.5 Mm Plasterboard Gf-I-W2-C1: Approx. 57 M2-Planking Of Building On The Construction Of The Sanitary Installation Walls With 1-Layer 12.5 Mm Plasterboard Gf -I -W2 -C1 And 1 -Layer -Bound Building Boards C2: Approx. 36 M2 - Laif F30 For Openings Described In The Front Simplified Walls: Approx. 47 M - Laif F30 For Open -Ended Double -End Walls: Approx. 102 M - Static Detection For Reinforcement Profiles For On -Road Loads And For Free -Standing Wall: 1 Psch - Ceiling Cladding With Holzwolle Multi-Layer Plate With Mineral Wool D = 100 Mm: Approx. 450 M2-Wall Clothing With Wooden Wool Multi-Layer Plate With Mineral Wool D = 100 Mm: Approx. 125 M2
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.