Construction Work For Swimming Pool - Construction Of A Swimming Pool In Piekary Śląskie. 1. The Subject Of The Order Is The Construction Of A Complete Indoor Sports Pool Building Equipped With 8 Swimming Tracks With A Length Of 25 M Along With An Additional, Separate Tile, Equipped With Childrens Play Equipment. The Sports Pool Will Be Equipped With A Moving Bottom Of Two Swimming Tracks, Fenced By A Moving Town From The Rest Of The Swimming Pool. The Order Also Includes The Necessary, Remaining Infrastructure Of The Swimming Pool Building, In Particular: Sports, Cloakroom, Sanitary, Communication, Technical, Technological, Warehouse, Social As Well As Dressing Plants And Pool Facilities (Level -1: Basement, Swimming Pool Technology, Technical And Technological Facilities, Underbasin Hall, Rooms, Installations And Technological Equipment, And Technological Equipment, And Technological Equipment And Technological Equipment, And Technological Equipment And Technological Equipment Social, Level 0: Swimming Pool Hall, Sanitary, Cloakroom, Input, Sports, Social, Level +1: Technical Part, Administration, Level +2: Roof, Renewable Energy Sources). The Building Will Be Equipped With Necessary Installations And Devices, In Particular Such As: Sanitary, Electric, Water-Sewage, Ventilation, Low-Current, Bms, Desire, Technological, Pool Technology, Lighting, Evacuation, Technical And Renewable Energy Sources. As Part Of The Task, The Necessary Land Development Should Also Be Done, In Particular Parking Lots, Pavements, Commuting, Communication, Utilities, Connections, Installations, Devices, Small Architecture, Green Areas And The Remaining Necessary Technical And Accompanying Infrastructure. 2. The Detachment Description Of The Subject Of The Contract Includes Annex 7 To Swz. 3. The Contracting Authority Included In The Scope Of Availability For Disabled People In The Description Of The Subject Of The Contract Constituting Annex 7 To Swz. 4. Due To The Flat -Rate Nature Of The Settlement, The Description Of The Subject Of The Contract Does Not Include The Bill Of Quantities. 5. The Contractor May Entrust The Performance Of Part Of The Subcontractors Order. 6. The Contractor Will Be Obliged To Grant At Least 5 Years Warranty And Warranty On The Entire Subject Of The Contract, Counted From The Date Of The Failure To Accept The Entire Subject Of The Contract. 7. Main Composition According To A Joint Public Procurement Dictionary: Cpv 45212212-5 Construction Works In The Field Of Swimming Pools 8. The Order Was Not Divided Into Parts. Such An Artificial Division Would Be Associated With The Need To Separate A Coherent Whole In The Form Of A Large Building Undertaking Covered By One Development Area And A Uniform Function. In Addition, This Is Indicated By The Conditions Of The Polish Order Program, From Which The Employer Obtains Funding For The Implementation Of The Order. The Contracting Authority For The Investment Received A Preliminary Promise Covering The Entire Subject Of The Contract. In The Event Of A Division Of The Order Into Parts And Failures Of One Of Them, The Ordering Party Would Threaten The Loss Of Financing For The Entire Order. The Subject Of The Order Is The Construction Of A New Facility, The Division Of The Order Into Parts With Such An Undertaking Would Cause Difficulties In Coordinating Various Activities