Construction Work - Establishment Of Service Flats In Balatonfüred. Further Details Of The Technical Content To Be Implemented Are Included In The Construction Plans And The Related Technical Description. The Construction Task Includes All Partwork Necessary To Implement The Technical Content In The Plans. Other Obligations And Tasks Of The Successful Tenderer: • The Entrepreneur Is Also Responsible For Conducting And Reimbursing The Necessary Public Space Bookings. • Contractors Obligation To Participate In The Cooperation And The Management Of The Construction During Construction On A Weekly Basis. • Demarcation And Preservation Of The March Area. Note: The Parade Area Must Be Designated At The Site Of The Property That It Does Not Interfere, Hinders Or Designate Its Contractor By Another Entrepreneur On The Same Plot. - Contracting Authority Draws Attention To The Provisions Of Decree 284/2007 On Certain Rules For Environmental Noise And Vibration. (X. 29.), And The 38/2023. (Xii. 22.), Which Is An Entrepreneurs Obligation To Comply With Legislation. Balatonfüred, Fürdő Utca., Hrsz.: 1248/40 Construction Is Located On Balatonfüred Fürd Street, Currently On Empty Building Sites (The Plot Of Utilities Do Not Have Connections, But There Are All The Necessary Utilities On Fürd Street, 2 Pieces (Useful Floor Space 876.3 M2) And B (Useful Floor Space 876.3 M2). The Buildings Have Two Levels To Be Provided With The Apartments. Room For Building Engineering, Plus A Surface Parking Room, 26 Bedrooms, A Separate Toilet And Bathrooms, 45-50 M2 Apartments With A Bedroom And Bathrooms. The Vertical Bracket Is Responsible For Walls And Inner Transverse Walls With A Vertical 3 Layer Of Clt. Descriptions.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.