The Subject Of The Order Is The Reconstruction Of The Streets: M. Kopernika, A. Mickiewicza, Rybacka With The Intersections Of Ul. Bohaterów In Warsaw And Gryf Pomorski With A Total Length Of 836 M (I.E. Ul. M. Kopernika: 253 M; Ul. Mickiewicza: 400 M, Ul. Rybacka: 183 M) And Widths From 4.50 To 6.0 M.2.1. The Scope Of Works Includes: 1) Execution Of The Expansion Layer On Ul. M. Copernicus (On The Section About 215 M From The Police Station Building M. Kopernika 2 To The Intersection With Heroów Warsaw Street) On 2.5 M Wide (According To The Fig 4 Cm With Removal Of The Material From Demolition At A Distance To 1 Km-Approx. 537.5 M2, B) Mechanical Purification Of Road Surfaces, C) Sprinkling Asphalt Of Road Surfaces, D) Surfaces Made Of Mineral And Bullums Mixtures 5Cm Thick Asphalt Mixtures (Binding Layer)-Approx. 537.5 M2.2) Removing The Surface From The Stone Cube (5.5) M2) And Making A Compensatory Layer From Asphalt Mineral And Bitumous Mixtures On Ul. Rybacka - 5.5M2 (Intersection With A. Mickiewicza Street) - (According To The Figure, Making The Expansion Layer And Removal Of The Surface From The Ankle) .3) Vertical Regulations Of The Wells For Water Valves, For Channel Hatches, For Street Sewage Boxes (30 Pcs), Including Replacement Of 3 Channel Hatching. Collapse- 1 Set,- Milling Of Unevenness- 1 Set,- Mechanical Cleaning Of The Existing Surface- 1 Set,- Sprinkling Asphalt Of Road Surfaces- 1 Set. Construction Along The Entire Width Of Streets: M. Kopernika, A. Mickiewicza, Rybacka With Intersections Ul. Bohaterów In Warsaw And The Pomeranian Gryf Surface Of The Ac11s 50/70 Thick Asphalt Concrete 5Cm (The Estimated Range Of The Surface Is About 4,510.00 M2) .5) Recreation Of Horizontal Marking With Chlorochacacal Paint - Estimated Value Of Approx. 100.33 M2.6) Congresses - Translating Existing Entrances And Adjustment Of Curbs High - 1 Kpl.2.2. In Terms Of Asphalt Binder Requirements, Road Asphalts Should Be Used According To Pn-En 12591 [27] Or Polymeroasphalt According To Pn-En 14023 [59]-In Accordance With The Technical Specification. 2.3. As Part Of This Contract, The Contractor Will Be Obliged To:- Implement All Works In Accordance With Applicable Regulations, Applicable Standards, Technical Conditions, Technical Knowledge And Health And Safety Regulations;- Responsibility From The Consequences And For The Results Of Activities In The Field Of: A) Organization And Service; B) Securing The Interests Of Third Parties; C) Environmental Protection; D) Work Safety And Hygiene Conditions; E) Organization And Maintaining Works; F) Road And Pedestrian Safety; G) Protection Of Property Related To Conducting Works. The Contractor Bears Full Responsibility For Maintaining The Marking And Securing The Robot During Their Performance. The Factory And User/Owners Fact And Undertakes To Repair Damage According To The Guidelines And In Consultation With The User/Owner. - During The Implementation Of The Work, The Contractor Will Maintain The Area O
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.