Scope Of Construction Works: 1. Reconstruction Of Loggia: 1.1. Disassembly Of The Balustrade, The Formation Of Floor, Plaster And Removal Of A Layer Of Polystyrene, Demolition Of Walls According To The Drawing, 1.2. Division Of Rooms - According To The Drawing, 1.3. Performance Of Structural Works In Accordance With The Centered Drawings, 1.4. Making A New Floor, 1.5. Making A Suspended Ceiling, 1.6. Installation Of Joinery: Interior Doors - In Accordance With The Combination Of Joinery And Windows Along With The Teeth, 1.7. Finishing Walls And Floors, 1.8. Disassembly Of The Old Electrical Installation, Frames And Accessories, Modernization And Expansion Of The Internal Acceptance Installation, Consisting In Making New Cables, General Lighting Lamps, Emergency Lighting, Evacuation Directional And Plug Sockets, 1.9. Installation Of Lighting Electrical Installation, 1.10. Installation Of The Central Heating Installation 1.11. Renovation Of The Facade. 2. Renovation Of Rooms: 2.1. Disassembly Of Sanitary Facilities, Removal Of Floor Finishing Layers, Demolition Of Walls According To The Drawing, 2.2. Replacement Of The Sewage Division2.3. Division Of Rooms - According To The Drawing, 2.4. Making A New Floor From The Pvc Floor Covering In Rooms, 2.5. Making A New Floor In Sanitary Rooms Made Of Ceramic Tiles, 2.6. Installation Of Joinery: Interior Doors-Adequate With The Combination Of Joinery And Windows Along With The Teeth, 2.7. Finishing Walls From Cement Coating, 2.8. Finishing Walls Of Sanitary Rooms Made Of Ceramic Tiles, 2.9. Disassembly Of The Old Electrical Installation, Luminaires And Accessories, Modernization And Expansion Of The Internal Acceptance Installation, Consisting In Making New Cables, General Lighting Lamps, Emergency Lighting, Evacuation Directional And Plug Sockets, 2.10. Installation Of Lighting Electrical Installation, 2.11. Replacement Of Radiators And Installation Of Radiator Covers Made Of Mdf In The Renovated Part, 2.12. Replacement Of Window Sills In The Renovated Part, 2.13. Installation Of Toilet Cabins In The Bathroom Made Of Hpl Boards Or Made Of Material With Better Parameters According To The Drawing, 2.14. Installation In Bathrooms Washbasins With Batteries On The Top Of The Hpl Board Or Made Of Material With Better Parameters, 2.15. Replacement Of Ventilation And Sewage Grilles, 2.16. Installation Of An Utility Sink With A Battery In The Utility Room And Construction Of Necessary Installations. 3. Replacement Of Lighting Fittings In All Renovated Rooms. 4. The Detailed Scope Of Works Was Specified In The Design Documentation Constituting Annex 11 To Swz And The Specification Of The Terms Of The Contract (Swz).