1. The Subject Of The Contract Is Construction Of Sanitary Sewage System And Water Supply Network For Investment Areas In Krasowa - Stage Ii. Scope Of The Subject Of The Contract1) General Characteristics Of The Project: The Scope Of The Planned Undertaking Called Expansion Of The Sanitary Sewage System And The Water Supply Network In The Leśnica Commune - Weapons Of Investment Areas In Krasowa. Stage Ii - Expansion Of The Sanitary Sewage Network And The Water Supply Network Within The Krasów M. Investment In Krasowa, District Water Supply Network (I.E. Segment Of The W-2 Water Supply From The Wz-2 Node T7) And Gravitational Resolving Sanitary Sewage System (I.E. Ks-1.1 Collector From The Sk1 Well To The Sk18 Well) .2) Total Material Scope Of The Sanitary Industry Project Resolution From The Pipes Ø110x6.6Mm Pe100 Sdr17 Pn10 - 733.0 M- Hydrants Pipeline From The Ø90x5.4Mm Pe100 Sdr17 Pn10 - 11.5 M - Army Hydrant Dn80 With A Shut -Off Latch - 7 Kpl.B) In Terms Of Sanitarian Sewage Network: - Channels - Channels Gravitational Network With Pipes Ø200mm Pvc -U - 320.0 M- Revision Sewage Wells Ø1000mm Concrete - 6 Pcs. 3. The Full Scope And Description Of The Subject Of The Contract Is Determined By:- Architectural And Construction Design, Technical Design,- Technical Specification Of The Execution And Acceptance Of Works,- Auxiliary Design Of Works,- Made Available By The Contracting Authority A Local Vision. All Work Will Be Carried Out By The Contractor Independently. 4. Note! The Contractor Will Also Include In General Costs: Geodetic Service, As -Built Geodetic Inventory, Together With The Electronic Version Of Cegeo; Ceretion Separate Provisions Require The Preparation Of Such A Plan, Organization And Marking Of Construction, For The Time Of Conducting Works, Providing Access To Other Facilities At The Property, Renovation And Repair Of Damage Arising In The Road Lane, Tests And Acceptance Involving The Required State Institutions, Investor And User, Collecting Waste Resulting From The Implementation Of The Subject Of The Order And Transferring Them To Recovery, And Transferring Them To Recovery, Disposal Or Storage (Including The Cost Of Recycling Materials From Demolition Or Waste Storage At A Landfill), Organizing The Construction Site After Completion Of Works.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.