GTR 97001177
Tenders Are Invited For Retrofitting And Modernization Of Water And Sewage Infrastructure And Waste Management In The Mielec Commune Delivery And Car Scale Installation - 50 Mg (Repeated Order)
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
97001177
Tendering Authority
Subscribe to view
Tender No
ZP.271.7.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Retrofitting And Modernization Of Water And Sewage Infrastructure And Waste Management In The Mielec Commune Delivery And Car Scale Installation - 50 Mg (Repeated Order)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
02-06-2025
Closed
Work Detail
The Subject Of The Order Is The Delivery And Installation Of A Car Scale - 50 Mg, According To The Description Below, Development Plan, A Prejudice Of Works, St. Typical Car Scale Consists Of A Platform Weighing On Tensometric Sensors And Electronic Equipment. Dimensions Of The Platform: 15 M X 3 M. Vacation Car With Dimensions:- Volume Length 15 M, Plus Two Invasions Length 3.5 M- Weight Width 3 M. Flacking On Prefabricated Foundations (Invasions) And On The Middle Supports, On A Hardened Underpack (Ordinary Sand Thickened 20 Cm And Undercoat Of Broken Stone 50 Cm). - Protected/Paint -Covered Construction - Based On Tenometric Mass Sensors, The Foundation Of The Driving Surface With The Invasion Version. The Bridges Platforms Allow Not To Be Overcome To The Ground And Cleaning The Weight From The Impurities Accumulating In It. The Work Of Works Presented In The Premises Is An Indifferent Respect Of The Quantity Of The Quantity Of The Quantity Of The Quantity Of Pre -Class Units Are Estimated And They Are Not Asleep. The Contractor Should Calculate The Contract In Such A Way That The Material Scope Specified In This Documentation Is Made In Full. Any Change In The Number Of Works Of Individual Predecessor Items Will Not Constitute A Basis For Increasing The Value Of The Contract - The Contract Is A Flat -Rate, Not Measurement. The Development Plan, The Bill Of Quantities And St. The Robot Provided By The Ordering Party Is Only A Description Of The Subject Of The Contract, They Are An Auxiliary Element, Not The Basis For The Valuation Of Construction Works, Are Aimed At Facilitating The Contractor To Prepare An Offer. The Contractor Is Obliged To Carefully Check The Amount Of Robots. The Contract For Robots In The Proceedings Will Be A Flat -Rate Agreement In The Event Of A More Robot During The Robot In Any Predecessor Position, This May Not Be Considered Additional Works With An Additional Remuneration. Any Lack In The Pre -City Robot Does Not Release The Contractor From The Obligation To Perform Them At The Contractual Price. The Above -Mentioned Scope Of Works May Include The Contractor As Separate Items Of The Offer Cost Estimate With Own Calculations Or Include In The General Costs Of The Offer Cost Estimate. If They Are Not Considered In Separate Items Of The Cost Estimate, The Employer Will Consider That They Have Been Included In The General Costs Of The Offer Cost Estimate. The Contractor Will Submit An Offer Cost Estimate Before Signing The Contract Indicating The Method Of Calculating The Offer Price And The Scope Of The Material.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
67dfe0ab-a999-48a2-a798-5ff69a010545.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.