Photovoltaic Cells - Fve 500 Airport Košice. A. Construction Of A New Res Electricity Plant, Which Is A Device Or Group Of Devices That Use Solar Energy For Direct Electricity Production And Which Will Be Connected Directly Or Through The Transformer To A Direct Line, To The Distribution System Or To The Transmission System With A Total Installed Output Of 0.5 Mw. B. Construction Of A New Electricity Storage Device (Battery System) Connected In The Offtake And Handover Point Of The Electricity Production Device From Res In The Previous Point A. The Subject Of The Contract Also Includes Transportation To The Place Of Performance, Assembly And Launch, Including Function Tests, Engineering, Revision And Training Service.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.