Architectural, Construction, Engineering And Inspection Services - Planner Freiler Phase 32, 33 And Optional 41. Swissgrid Plans To Cable The Existing Overhead Line Via The Grimselpass. From The New Transition Structure On The Valais Side In Oberwald To A New Connection Mast To The Existing Overhead Line Via The Nufenenpass, The Overhead Line Must Be Re -Planned. For The Development Of The Construction Project And The Accompaniment Of The Approval Phase As Well As Optionally For The Tender Phase, Engineering Services In The Department Of Planning Of Executive Leau Are Required. In The Present Order, The Necessary Planner Services For Sia Phase 32 Are Provided In Order To Be Able To Complete The Phase Construction Project Completely. The Pgv Dossiers Must Also Be Created For The Following Phase 33. The Planner Services Are Provided In Close Cooperation With A Cable Planner (Transition Structure) And Other Specialists. With The Present Tender, The Corresponding Planner Services For The Department Department Are To Be Procured. The Scope Of Services Includes: Planning Of A New, Two-Stranded 220 Kv Overhead Line Connection Over A Total Length Of Approx. 4.5 Km With 14 New Structures. Further Details Can Be Found From The Specification.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.