Tenders Are Invited For Heating, Ventilation And Air -Conditioning Installation Work - Federal Council - Cultivation With Visitor Center - Ve 4-03.1 Ventilation Systems According To Din 18 379 - Award 78/2025
Tenders Are Invited For Heating, Ventilation And Air -Conditioning Installation Work - Federal Council - Cultivation With Visitor Center - Ve 4-03.1 Ventilation Systems According To Din 18 379 - Award 78/2025
Heating, Ventilation And Air -Conditioning Installation Work - Federal Council - Cultivation With Visitor Center - Ve 4-03.1 Ventilation Systems According To Din 18 379 - Award 78/2025. The Type And Scope Of The Performance: The 5-Storey Head Building (Visitor Center) And The Administrative Wing Are Each Supplied Via A Separate Ventilation Center In The Basement. The Outside Air Intake Is Via A Common Ventilation Structure. The Advanced Air Is Held Centrally Via The Roof On The Roof. The Following Rlt Systems Are Built In The Visitor Center (Bz): - Ventilation Systems (L3 Toilet Axis 6-17 5.110M³/H, L7 Chillers 305M³/H) - Machine Smoke Extraction Systems (Mr1 Ventilation Center 1 Approx. 10,800M³/H, Mr2 Storage Rooms Basically (Bz Approx. 4,000M³/H) - Cold Smoke Ventilation Mra6 Conference Range 3,060/10,000M³/H-Partial Climate Systems (L1 Ug Storage Technology Axis 1-22 5.985M³/H, T1 Entrance Hall/Waiting Zone/Multifunctional Room 12.225M³/H, T1.1 Supplementary Room 6,150M³/H)-Climate Systems (K4 Conference, Seminar Room 1.-3. 13,457M³/H, K6 Conference, Seminar Room 5.690M³/H)-Climate Cabinets (K1.1/K1.2 It Center Approx. 26,000M³/H) The Following Rlt Systems Are Built In The Administrative Wing (Vwt):-Ventilation Systems (L4 Toilet Axis 34-37 2.260M³/H, L5 Garbage Room 1,600M³/H, L6 Saparier Room 590M³/H, L8 Sibe 50M³/H, L10 Banquet Kitchen 3,800M³/H (External Installation On The Roof)) - Machine -Of -Machine Smoke Extraction Systems (Mr3 Ventilation Center 2 Approx. 10,000M³/H,/Mr4 Storage Room Ug Vwt Vwt Approx. 5,000M³/H) - Partial Climate Systems (L2 Ug Lager Technology Axis 22-42 9.830M³/H, T2 Axis 20-24 3.495M³/H) - Climate Systems (K2 Archive 4,690M³/H, K3 Library 10.290M³/H, K5 Meeting Room 6.01 2.120M³/H) - Climate Cabinets (K2.1 Archive Magazine 2.165M³/H, K2. Archive Magazine 2.10.02/03 4.390M³/H K2.3 Archive Magazine 2.11 1,090M³/H, K2.4 Separate Room 2.09 1,815M³/H) In The Area Of Prussian Mansion (Phh), Following Rlt Systems Are Circulated Or Adapted: - Adaptation Investigation Systems 8 And 19 To Current Use In The Ground Additional Smoke For Tankers In The Ug Are Part Of The Tender, 4 Years. To Observe The Building On The Construction Site, The Client Is Found In The Form Of At Least Monthly Construction. 08/2025 Execution: 01/2028
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.