Tenders Are Invited For Consultative Engineering And Construction Services - Consulting And Supervision Services Execution Works For The Objective Modernizing The Electricity Distribution Infrastructure In Constanța Port - Stage Ii
Tenders Are Invited For Consultative Engineering And Construction Services - Consulting And Supervision Services Execution Works For The Objective Modernizing The Electricity Distribution Infrastructure In Constanța Port - Stage Ii
Consultative Engineering And Construction Services - Consulting And Supervision Services Execution Works For The Objective Modernizing The Electricity Distribution Infrastructure In Constanța Port - Stage Ii. According To The Specification No. 14235 Of 04.04.2025. Duration: 97 Months (11 Months Design Period + 25 Months Execution Period + 1 Month Closing Period Works And Reception At The End Of Works + 60 Months Warranty Period). Continue Gp Information: The Way Of Setting Up The Participation Guarantee: According To Art. 164 Para. (2) And Para. (4) Of Law 99/2016. The Guarantee Tool Must Provide That The Participation Guarantee Is Irrevocable And That The Payment Of The Participation Guarantee Will Be Executed Unconditionally, Respectively At The First Request Of The Beneficiary, Based On His Statement Regarding The Guilt Of The Guaranteed Person, Without Exception. In The Case Of Submission Of Offers In Association, The Participation Guarantee Must Be Constituted On Behalf Of The Association And To Mention That It Covers All The Members Of The Group Of Economic Operators. The Situations Of Detention Of The Participation Guarantee Are Provided By Art. 43 Of Gd 394/2016 And All In The Guarantee Tool Must Be Mentioned. The Contracting Entity Has The Right To Withhold The Guarantee, According To Art.43 Of Gd No.394/2016. The Contracting Entity May Request The Extension Of The Validity Period Of The Offer. If The Bidder Extends The Validity Period Of The Offer, The Validity Period Of The Participation Guarantee Will Be Prolonged. If The Participation Guarantee Is Constituted By Bank Transfer (Payment Order), The Following Account Will Be Used: - Iban Ro83brde140sv06373001400 Opened At B.R.D.; - Iban Ro26btrl01401202693122xx Opened At Banca Transilvania. The Proof Of The Constitution Of The Guarantee Must Be Presented In The Seap (Signed With The Extended Electronic Signature Of The Legal/Empowered Representative) At The Latest On The Date And Time For The Submission Of Tenders (The Guarantee Issued In Another Language Will Be Accompanied By An Authorized Translation Into Romanian). The Equivalent For A Guarantee Submitted In Another Currency Than In Lei, Will Be Made At The Average Annual Course In Lei/Currency Communicated By The Nbr. In The Case Of Submitting Offers In Association, The Participation Guarantee Must Be Constituted On Behalf Of The Association And It Is Mentioned That All The Members Of The Group Of Economic Operators Are In Solidarity. Failure To Present The Participation Guarantee With The Offer Entails Rejecting The Offer As Unacceptable Under Art. 143 Para. (2) Lit. K) Of Gd 394/2016, With Subsequent Completions And Modifications. The Participation Guarantee Is Returned Under The Conditions Of Art. 1641 Of Law No. 99 // 2016, With Subsequent Completions And Changes. The Participation Guarantee Issued In Another Language Will Be Loaded In The Seap, Accompanied By The Authorized Translation In Romanian, Following Which, At The Request Of The Contracting Authority, It Will Be Presented In The Original Form Issued In The State Of Residence. In The Situation In Which The Participation Guarantee Is Constituted By The Guarantee Policy Or Letter Of Bank Guarantee, The Bidder Has The Obligation To Transmit The Original Tool Of Ga
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.