Tenders Are Invited For Railway Construction Works – Tender For A Design & Built Contract Regarding Structures And Civil Works For The Kalvebod Passing Track (Sub-Project 1)
Tenders Are Invited For Railway Construction Works – Tender For A Design & Built Contract Regarding Structures And Civil Works For The Kalvebod Passing Track (Sub-Project 1)
Railway Construction Works – Tender For A Design & Built Contract Regarding Structures And Civil Works For The Kalvebod Passing Track (Sub-Project 1). On 4 April 2024, Folketinget (The Danish Parliament) Passed A Law On The Upgrading Of The Øresund Line, Wherein It Has Been Decided To Construct Two Passing Tracks At Kalvebod. A/S Øresund Has Been Tasked By The Ministry Of Transport To Implement The Project ’Passing Track Kalvebod’. Several Preliminary Investigations Have Been Carried Out So Far. The Relevant Material Is Available At: Https://Sundogbaelt.Dk/Forbindelser/Overhalingsspor/. The Project Comprises The Establishment Of Two New Tracks Parallel To The Two Existing Tracks. The Project Also Includes A Restructuring Of The Hammelstrupvej Bridge To Accommodate Four Tracks As Opposed To The Current Two Tracks And The Replacement Of Two Footbridges Across The Line. The Two New Tracks Will Require The Establishment Of New Traction Power Comprising Gallows Masts Covering Both Tracks. The Current Neutral Section Must Also Be Moved And Pumping Station 2 Must Undergo Some Reconstruction To Accommodate The New Tracks. Sheet Piling Must Also Be Installed Along The Entire Section To Keep The Earth Embankment In Place And Provide Room For The Two Tracks. The Project Passing Track Kalvebod Will Be Established In Two Sub-Projects: Sub-Project 1 ”Structures And Civil Works” And Sub-Project 2 ”Track And Traction Power”. This Tender Concerns The Sub-Project 1. Sub-Project 1 Will Be Particularly Logistically Complicated To Execute In That The Work Will Be Carried Out Without Direct Access, In Very Little Space, With Difficult Soil Conditions And Water And Drainage Challenges. Ac-Cess For Vehicles, Cyclists And Pedestrians Must Be Ensured Continuously Throughout The Construction Period And Special Attention Will Need To Be Paid To Neighbours And Stakeholders In The Area. Sub-Project 1 Includes All Construction And Structural Works For The Passing Tracks And Bridges/Footbridges (Including Geotechnical Conditions For Both Slopes And Structures, Removal And Relocation Of Soil, A New Drainage System, Bridge Expansion And Two New Footbridges, The Establishment Of Sheet Piles, Noise Barriers, Traction Power Systems, And Signalling Works (To Be Coordinated And Executed By Banedanmark). As Regards Sub-Project 1, A/S Øresund Wishes To Enter Into A Design & Build Contract With One Design & Build Contractor. The Client Also Wants Close Collaboration With The Design & Build Contractor As Regards The Project’S Development, Including The Choice Of Subsolutions, Options For Alternative Approaches To Construction Logistics, Including The Establishment Of Sheet Piles And Footbridges, The Management Of Water And Soil Conditions And The Options For Sustainable And Climate Optimised Solutions. It Is On This Basis That The Design & Build Contract Will Comprise An Initial Collaboration And Project Development Phase (Hereinafter The Cpd Phase) And A Detailed Design And Execution Phase. The Purpose Of The Cpd Phase Is To Ensure The Development Of The Project In A Collaboration Between The Design & Build Contractor And T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.