3.1. The Subject Of The Contract Is The Renovation Of Three Bridges, Along Forest Roads, Damaged As A Result Of Floods In September 2024, The Description Of The Existing Result Of The Result Of Heavy Rainfall, Which Took Place In September 2024. The Concrete Brushwood Was Washed On Bridges No. 1 And 2 And The Washing Of The Resistance Wall Of The Bridge No. 3. Bridges No. 1 And 2 Are Referred To As Medium, And Bridge No. 3 As Good. Bridges No. 1 And 2 Require The Conquest Of Washed -Out Foundations, Replacement Of Wooden Roadway, Making New Communication Barriers, And Maintenance Of Steel Beams Of The Ceiling. Bridge No. 3 Requires Strengthening The Foundation Of Support By Supplementing With Concrete Gaps.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.