Sanitary Fixture Installation Work- Chem Upls- Announcement: Heating, Air Conditioning, Ventilation And Sanitary Installations. Three Construction Phases That Are To Be Carried Out One After The Other. 1. Lits Portes: Conversion Of Two Pediatric Examination Room And Hr Area Into Four Lits-Up Areas With 8 New Patient Loungers, Two Of Them For Psychiatric Patients 2. Urgence Box 1-3: Conversion Of The Waiting Area With Reception Of The Central Emergency Room In Three Examination Boxes With A Smaller Waiting Area 3. Pediatry: Conversion Of Three Treatment Rooms The Following Work Must Be Carried Out:- Adjustment And Expansion Of The Existing Air Distribution, Installation Of The New Sewer And Pipe Guidance, As Well As 41 Air Outlets - Adaptation And Expansion Of The Existing Cold Water Network, Installation Of New Cooling Ceilings In Seven Rooms - Adaptation And Expansion Of The Existing Heating Nets, Installation Of Three Radiator In Clinic Version - Adaptation Of The Existing Drinking Water Network, Installation Of Nine Washbasins - Adjustment And Expansion Of The Existing Network Of Medical Gases For The New Beds: Oxygen, Emergency Oxygen, Medical Compressed Air And Vacuum - Adaptation And Expansion Of The Existing Wet Snaplife Network, Installation Of 80 Sprinkler Heads In And Below
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.