Quotation Are Invited For Measured Works - Surveying The Boundary Lines, Site Clearing, Removal Of Vegetation And Debris If Any In Order To Commence The Work (M) (70)
Quotation Are Invited For Measured Works - Surveying The Boundary Lines, Site Clearing, Removal Of Vegetation And Debris If Any In Order To Commence The Work (M) (70)
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
09-06-2025
Work Detail
Quotation are invited for Bill No.2 Measured Works 1- Surveying the Boundary Lines, Site Clearing, Removal of Vegetation and Debris if Any in Order to Commence the Work (M) (70). 2- Pit Excavation for footing and plinth beam including levelling and compaction to receive the Blinding (m3)(130) 3- Back filling around Excavations with selected excavated materials(m3)(116) 4- Disposal of Earth to approved municipality dumping yard or levelling at Site as per the Instruction of the Engineer (m3)(15) 5- PCC :Grade 15 below footing as per the drawing / specification(m3)(2) 6- PCC, Grade 15, below Plinth beam as per the drawing / specificationm33 7- RCC Grade 30, for footing including the Cost of supply and fixing of Reinforcement as per the drawing / specification (m3) (4) Last Date for Submission:09/06/2025 Tender Link : https://tenders.squ.edu.om/AllCategs
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.