Tenders Are Invited For Overhauled Overhaul With The Concrete Cover And Facilities Of The Car Lever Canal

Tender Detail

96830855
111484
Self-Funded
Tenders Are Invited For Overhauled Overhaul With The Concrete Cover And Facilities Of The Car Lever Canal
NCB
Western Asia
Commonwealth of Independent States, CIS
04-06-2025

Work Detail

To Add The Soil In The Next 10 M Transportation Of The Ground: 01-01-031-2 To The Norm (Additional 20M), Chalovs Capacity 0.65 (03-0.8) Is 0.65 (03-0.8) Setting Of Channels And Dambalans With Birchalov Excavators, Group: 2 Digging A Temporary Cyclub), Drilling Of The Ground By Moving To 10 M, Bulldozers Power: 96 (130) Kw (A.G.), Group 2 Group [Correction Of Land Partitions To Prevent The Renovated Parts Of The Channel), Grount 10 M Transportation Of The Ground. To Add: (Additional 20M), Filling Of Pits And Trenches By Changing The Ground Up To 5 In Grunt 5: 96 (130) Kwh: 96 (130) Kw (A.G, Group Group (Casting The Temporary Channel Channel), Establishment Of Channels And Daunbas With Excavators Of 0.65 (11.5-0.8) With The Capacity Of 0.65 (11.5-0.8), Group Of Group: 2 (Removal Of Land Partitions), Excavators With 0.65 (0.5-1) M3 With The Capacity Of The Clique, Group Of Group: 2 (For The Repair Of The Shared Parts Of The Channel), Freight To Carpets With A Cargo Capacity Of 10 Tons, Transportation Of Cargo With Cars, Transportation Distance -3 Km. 1St-Grade Load, Construction Of Dams, Dambaiann, Cuts And Dry Cubes With The Structure Of The Lower Parts Of The Plains And Masses To 16 T, The Capacity Of The Clique Was Thrown Away By The Opposite Challenged Or Draqlay Or Draglayi Excavators, Group Of Group: 2 (Canal Cleansing), Yamadi, Which Is Up To 2 M In The Ditch, Manually Drilling Without The Fasteners Of The Ground, Group: 2 (Manually Dried), Disassembly Of Concrete Moiiolitizations Inspectively Channel Bowl And Slopes Useless Concrete, Construction Waste Loaded With Excavator With 0.5 M3 Of The Capacity Of The Chalov: Download (Concrete Crumbs), Freight To Carpets, Which Operate Outside The Carpet, Transporting Cargo Outside The Carpets, Transporting Cargo, Transportation Distance - 3 Km. 1St-Grade Load, Hand Planning Of The Bottom And Slopes Of Ducruged Places, Group Group: 2

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail