Tenders Are Invited For Engineering Design Services For Traffic Installation - Planning Services Flood Protection (Cervical Spine): Loo 3 - Transport System Planning, Special Services.
Tenders Are Invited For Engineering Design Services For Traffic Installation - Planning Services Flood Protection (Cervical Spine): Loo 3 - Transport System Planning, Special Services.
Engineering Design Services For Traffic Installation - Planning Services Flood Protection (Cervical Spine): Loo 3 - Transport System Planning, Special Services.. # 5.1.A Background. The Hws Concept Provides 5 Individual Measures, Including The Construction Of A 360,000 M³ Flood Retention Basin, The Size Of Which Was Determined On Data Bases Updated In 2024/2025. At The Planned Hrb Location, This Results In A Laying/Adaptation Of The K1243 District Road Running There. The Construction Of A Smaller Flood Retention Basin (240,000 M³) Was Originally Considered; For This Smaller Hrb, For Which A Design/Approval Planning From 2010 Is Available, No Adaptation Of The Road Would Have Been Required. The Corresponding Planning Documents Can Therefore Only Be Used As A Supplementary Source Of Information And Are Made Available In Level 2 Of The Award Procedure. The Geotechnical Examination Created In 2007 Will Also Be Presented To This Hrb And The 2025 Updated River Area Examination For The Tiefenbachtal. # 5.1.B Scope Of Services. The Planning Services Are Initially Awarded Until Preliminary Planning (Lp1+2). Further Services (Lp3-9) Are Optionally Allocated; There Is No Claim To This. The Task Includes The Following Planning Services: Transport System Planning, Local Construction Monitoring, Planning Accompanying Measurement Including Dgm, Management Exploration Of Further Special Services. As Part Of The Lp1+2, The Boundary Conditions And The Basics For The Project Must Be Coordinated In Consultation With The Esslingen District (Construction Load Carrier Of The District Road), The Rp Stuttgart, The City Of Nürtingen (Client) And The Object Planner For The Flood Retention Basin. Only Then Can The Scope Of The Services For Transport System Planning Be Determined. # 5.1.C Appointment Track. A) Commissioning: Vsl. In Early October 2025. B) Support Hws Object Planner (Preliminary Planning By The End Of November 2025). C) Planning Until Preliminary Planning Of The Loses Advertised Here: At The End Of December 2025. These Appointments Will Be Part Of The Contract In The Event Case, Provided That The Ag Does Not Communicate A Amended Appointment Specifications In The Award Procedure. Immediately After The Start Of The Service, The Commissioned Bidder Must Be Drawn Up A Corresponding Schedule For The Implementation In The Draft And Coordinated With The Ag, Which Identifies These Appointments As A Frame Dates.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.