Tenders Are Invited For Sludge-Ratment Works-Mm-Cl-01 Design And Execution (Including The Designer Conf. Law 10/1995) Improving The Treatment Of Sludge

Tender Detail

96805575
322133-2025
Self-Funded
Tenders Are Invited For Sludge-Ratment Works-Mm-Cl-01 Design And Execution (Including The Designer Conf. Law 10/1995) Improving The Treatment Of Sludge
NCB
Eastern Europe
Balkans,European Union
24-06-2025

Work Detail

Sludge-Ratment Works-Mm-Cl-01 Design And Execution (Including The Designer Conf. Law 10/1995) Improving The Treatment Of Sludge. The Contract Includes Design, Execution And Technical Assistance From The Designer For The Objective Mm -Cl -01 - Design And Execution (Including From The Designer Conf Law 10/1995) - Improving The Treatment Of Mud For: Improving The Treatment Of Sludge At The Baia Mare Treatment Station, Which Will Mainly Include The Following: - Baia Mare Treatment; - Making The Vidanjat Namol Reception Station, Including 2 Containers With A Folding Cap With A Capacity Of 1.1 Cubic Meters; - The Platform Covered By Approx. 400 Sqm For Dehydrated Sludge Storage From Seau-Ri Before Being Introduced Into The Drying Installation; - The Purchase Of Dehydrated Sludge Transport Cars Including Containers (20 Mc-2 Pcs) From The Treatment Plants Existing At Seau Baia Mare, With A Capacity Of 20 T- 2 Pcs.; This Information Is Indicative. The Technical Project Of The Sludge Drying Installation Will Be Carried Out By The Entrepreneur. The Technical Project Will Also Include The Vertical Arrangement / Systematization Of The Site. The Contract For The Design And Execution Of The Objective Mm -Cl -01 - Design And Execution (Including From The Designer Conf Law 10/1995) - Improving The Treatment Of The Sludge Includes: A) The Design Activities - The Technical Execution Project, Which Will Include All The Necessary Documents According To The Legislation And Any Documentation Necessary To Obtain The Authorities; Support For The Beneficiary In Obtaining The Necessary Authorizations And Opinions; B) Construction Works; C) Supply And Installation Of Technological Equipment And Equipment; D) Testing And Commissioning; E) Training Of The Beneficiary Personnel. F) Remediation Of Any Defects That Occur In The Warranty Period. G) During The Execution Period Of The Works, The Contractor Will Also Provide The Technical Assistance From The Designer, With All The Legal Attributions That Are For This Purpose. The Duration Of Design And Execution Of The Works And Commissioning Of The Installations Is 24 Months, Broken Down As Follows: - The Design Stage: Maximum 6 Calendar Months - The Execution Period Of The Works: Maximum 17 Calendar Months - The Testing And Commissioning Period: Maximum 1 Calendar Month The Notification Period Of The Defects (Pnd) Is At Least 36 Months) Reception At The End Of The Works.

Key Value

Tender Value
4,42,16,948 - RON

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail