In The Future, The Municipality Of Utrecht Expects To Make More And More Use Of The Expertise Of (Advisory) Agencies That Provide Engineering Services In The Field Of Green. This Concerns Outsourcing Work Based On A Result Obligation (No Hiring/ Exercise Obligation). The Municipality Of Utrecht Has To Deal With A High Number Of Assignments In The Field Of Green Expertise, Which Transcends The Capacity Of Its Own Staff. Green Expertise Includes The Ability To Advise And Deliver Written Products (E.G. Design Drawings) In All Areas Within The Category Of Greenery. The Complexity Of These Assignments Also Increases, Which Also Makes The Municipality Of Utrechts Sharing Sharing Between The Market And The Municipality Important. The Tender Is Split Into Two Plots: • Plot 1: Engineering Services Green (Except Flora And Fauna Quickscans / Ecology) • Plot 2: Flora And Fauna Quickscans / Ecology. Perceel 1, Ingenieursdiensten Groen Verwachte Omvang Van De Raamovereenkomst: De Gemeente Verwacht Over De Gehele Looptijd (Maximaal 4 Jaar) Van De Raamovereenkomst Diensten Af Te Nemen Met Een Verwachte Totale Waarde Van € 1.900.000,- Maximumomvang (Of: Begrenzing) Van De Raamovereenkomst: De Gemeente Neemt Gedurende De Looptijd Van De Raamovereenkomst Diensten Af, Met Een Maximale Totale Waarde Van € 3.800.000,- Zodra Het Maximumbedrag Bereikt The Framework Agreement Ends Automatically. The Maximum Size Is Greater Than The Expected Size Due To The Uncertainty In The Quantity Of Services To Be Forgiven. Plot 2, Flora And Fauna Quickscans/Ecology Expected Size Of The Framework Agreement: The Municipality Expects To Purchase Services Over The Entire Duration (Maximum 4 Years) With An Expected Total Value Of € 600,000 Because Two Parties Are Contracted Within This Plot, The Expected Total Value Is € 300,000 Per Party. Maximum Size (Or: Limiting) Of The Framework Agreement: The Municipality Will Purchase Services During The Term Of The Framework Agreement, With A Maximum Total Value Of € 1,200,000. As Soon As The Maximum Amount Is Reached, The Framework Agreement Ends Automatically. Because Two Parties Are Contracted Within This Plot, The Maximum Total Value Is € 600,000 Per Party. The Maximum Size Is Greater Than The Expected Size Due To The Uncertainty In The Quantity Of Services To Be Forgiven. You Cannot Derive Any Rights From These Values.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.