Construction Work - András Bgszc Fáy Technikum Knowledge Center. In Connection With The Project Rrf-2.2.2-23-2023-00011, The Project Rrf-2.2.2-23-Complex Development Of Budapest Mechanical Engineering Center Is An Investment Objective For The Demolition Of The 3 Tracted Ground-Storey Workshops In The Courtyard Of Bgszc, András Fáy Technical Technical, Replaced By An 823.99 M2. Construction Of A 2 -Storey Alternative Drive Knowledge Center, Which Provides An Attractive Learning Environment, Provides The Conditions For Quality Vocational Education. On The Ground Floor, There Are Workshops, Which Are Educated On Passenger Cars, Which Are Essential For The Physical Circulation Of The Car, The Examination And Repair Of The Mechanic Mine, And The Execution Of The Car Lift. The Shaft Of The Building Is Located In Water Blocks And Other Service Rooms, As Well As The Vertical Core, Which Can Be Accessed By The Upstairs Group Rooms And Performers. Installation: The Fáy András Technical In The Ix. District Located In The Downtown Closed-Line Zone (Zone Sign: Ln-1/Ix-R/30), The Area Of The Lenhossék-Master And Márton Streets, The Year Of Construction 1924, A Local Protected Building. The Main Building Is Approximately U -Shaped, With A Separate Part Of The Building On The Front Of The Márton Street Front, Which Contains Two Caretaker Apartments And Classrooms With Serving Water Blocks. The Courtyard Has A Current Three -Stroke Building Building With A Current Sandwich Panel, Which Is Not Known For Its Feature. The Building Currently Has Workshop Exercises For Students, But The Workshop Building Does Not Meet The Needs Of The Age (Energy, Sustainability, Functionality, Economy). The Three -Part Hall System Does Not Fit Aesthetically To Its Environment. After Examining The Existing Building, It Can Be Concluded That For Static Reasons It Cannot Be Expanded With Flooring, So Existing Workshops Should Be Demolished. The Demolition Plan Documentation Is Part Of The Complete Plan Package. The Building Is Positioned To Replace The Workshops To Be Demolished In Accordance With The Capabilities Of The Site. Due To The Well -Defined Geometric And Other Requirements Of The Building, The Mass Formation Of The Building Is Strictly Regulated. The Ground Floor Workshop Units Are Required Beyond The Minimum Floor Area With A Height Of 5 Meters, And The Top -Floor Lecturers And Group Rooms Are 3 Meters. Above The Ground Floor Hybrid Workshop, Given The Work Of Hydrogen -Powered Vehicles, No Room For A Long Stay Can Be Created. Thus, Over The Hybrid Workshop, We Create An Intense Green Roof. Floor Design: The Building Is Explored From The Road Via The Márton Street Vehicle. The Main Entrance Of The Building, The Lobby, The Inner Court Entrance Of The Existing School Building And The Exit Used By The Students. The Lobby Can Be Reached From Workshops, The Less Useful Position
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.