Tenders Are Invited For Construction Work - Replacement Aarebrücke Solothurn

Tender Detail

96757074
308480-2025
Self-Funded
Tenders Are Invited For Construction Work - Replacement Aarebrücke Solothurn
NCB
Western Europe
11-07-2025

Work Detail

Construction Work - Replacement Aarebrücke Solothurn. Replacement Building Of The Aarebrücken Solothurn The Two Steel Single -Track Bridges Over The Aare Between The Solothurn And Solothurn West Stations Are Replaced. The New Approx. 95M Long, Double-Lane Superstructure Consists Of Two Side Sheet Metal Carriers, Which Work Together With The Thin Uhfb Gravel Trough. The Existing Approx. 10M Long Superstructure Of The Römerstrasse Underpass Is Replaced With A Steel-Concrete Composite Construction. The Existing Substructures Are Reused And Reinforced. The Discontinuation Is Realized In An Extended Weekend Closure Of 100H. The Work Includes The Following Departments -Construction Work / General Civil Engineering * Installation, Preparatory Work * Various Compensation Work / Bars / Auxiliary Platforms In Accordance With Proposal And Renovation Natural Stone Masonry Pillar And Abutment * Dismantling Of Best. Two Aarebrücken (Steel Bridges With An Open Road) And The Underpass Römerstrasse (2 Wib Bridges) * Various Reinforced Concrete Work In The Substructures * Creation Of Uhfb Gravel Trough (Including Prefabrication) * Business Work And Workpieces-Steel Construction * Stahlhilfsjoche For Pre-Assembly And Installation Of A Steel Bridge Above The River * Corrosion Protection In Stages (In The Factory And Over River) * Crane Work, Special Transports, Vivid Work * Pneu Crane Work For The Digging Of The Wib Bridges, Moving Of Finished Parts And Other Dismantling * Spmt For Moving / Raising The Prefabricated Uf Römerstrasse * Selecting The Two Existing Bridges And The New Bridge * Various Pressing Work For All Bridges, Including The Prov. Aid For The Use Of Tracks * Caterpillar Work For The Collection Of The New Steel Beams * Hydraulic Engineering / Special Creation * Installations (E.G. Ponton Investment), Preparatory Work * Hydraulic Engineering Work With Pontoons * Kolkschutz * Steel Ram Piles In The River * Uncovered Anchors (Nails) And Pronounced Litze Anchor * Pontone Work Including Lifting Of Best. Bridges After Discontinuation For Removal

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 41fa5f02-281f-4a05-b7d8-9a429a39965f.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail