Construction Work-New Sihlsteg Spinnerei, Langnau A.A., Object No. 136-301 Kd/Ta. Construction Of A Clamping Band Bridge Of Around 53 M In Length Over The Sihl, Resonated And Supported With Preloaded Anchors Or Microps. Tensionband Made Of Pre -Fabricated Elements; Assembly On The Hanging Scaffolding Without Intermediate Support. Building Under The Closest Space. Education Of The Underwater Canal Of A Former Hydropower Plant In The Anchoring Area Of The Tension Band Bridge With An Reinforced Inner Arch; Sole With Unpaid Anchors Secured Vertically. In Addition, Conversion Of A Steel Construction, Plant Work, Covering Work. Main Cubature (Non -Binding Guidelines): Concrete Breakdown 15 M3 Natural Stone Breaking 50 M3 Breathing Breakdown 70 M2 Excavation 630 M3 Excavation Rock 40 M3 Underpinning 15 M3 Shotgear Concrete 20 M3 Floor Nail (Temporary) 70 M Unexpected Anchor 340 M Micropoles 350 M Fillings 10 M3 Road Drainage 15 M Dirty Water Pipes 30 M Drinking Water Pipes 35 M Oil Pipes 570 M Formwork 500 M2 Reinforcement 45 T Location Concrete Construction 225 M3 Pre-Fabricated Concrete Elements 20 M3 Filling / Shelter / Underlay Concrete 85 M3 Sealing 130 M2 Cast Asphalt 11 T Of Ride-Off Connections 10 M Hydrophobiering 100 M2 De / Montage Steel Construction 13 T Dee And Bute Montage Belage (Cpc Panels) 120 M2
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.