1. The Subject Of The Contract Is The Implementation Of The Investment Planned By Spzoz In Wieluń Entitled Reconstruction Of The Third Floor Of The C Building In Spzoz In Wieluń To Create A Geriatric Ward In The Formula Design, Build And Equip. 2. The Investment Will Consist In A Comprehensive Reconstruction Of Rooms Of The Third Floor Of The C Building In Spzoz In Wieluń At 16 Szpitalna Street On The Basis Of The Design Documentation Made By A Potential Contractor Together With The Delivery Of The Necessary Equipment, Equipment And Medical Equipment. 3. As A Result Of The Reconstruction, A Geriatric Ward Is Planned, Including:- 4 4-Bed Patients With A Hygiene And Sanitary Node- 2 Beds Of Bed Patients With Hygiene And Sanitary Node- Cabinet- Cabinet- Cabinet- Dining Room For Patients For Rehabilitation- Rooms For Personian And Social And Social Rooms (Nursing Duty),- Cloakroom, Social And Hygienic-Sanitary Rooms- Office Rooms (Head Of The Head Of Sanitary Wreath, A Room Of Doctors With A Sanitary Node, Secretariat)- Auxiliary Rooms (Dirtyer With Order Room, General Magazine, Bedding Warehouse)- Toilet. The Scope Of The Contract Includes: 1) The Implementation Of Multi -Branch Project Documentation Together With Obtaining All Necessary Opinions, Arrangements And Permits And Accepted By The Ordering Party2) On The Basis Of The Above -Mentioned Documentation Of All Construction, Assembly, Installation Works In The Scope Of All Installations Necessary For The Proper Functioning Of The Designed Geriatrics Department3) Supply And Installation Of Equipment, Equipment And Equipment Medical4) Conducting Final Acceptance Of Works In Accordance With Applicable Separate Provisions For The Reconstruction Of Existing Facilities Enabling Conducting Medical Activities In The Renovated And Rebuilt Part Covered By These Proceedings (Positive Opinion Of Psse In Wieluń, Psp Wieluń, Etc.) 5) Service Service During The Warranty Provided By The Contractor, The Scope Of The Contract Should Include The Entire Project Process, Reconstruction And Warranty Service And Warranty Service And Warranty Service An Individual Assumption Of The Contractor. 5. The Offer Should Include The Entire Investment Scope In Accordance With The Contracting Authoritys Guidelines And To The Necessary Extent, With The Obligation To Implement Design Studies Based On The Applicable Provisions Of The Construction And Related Law, Executive Regulations, Construction And Industry Standards, Technical Knowledge Principles As Well As Hygiene And Sanitary Requirements, Health And Safety And Fire Protection. And The Other 6. Tacial Description Of The Subject Of The Contract Are Included In Annexes 9 And 10 To Swz: Annex 9 To Swz - Functional And Utility Program (Pfu) Together With Further Attachments. Attachments To Pfu Regarding The Required Equipment And Equipment Marked As Annex 5 (List Of Equipment And Equipment) And Annex 10 (Specifications Of Equipment And Equipment) Constituting Its Integral Part
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.