1. The Subject Of The Contract Is The Implementation Of The Investment Task Entitled The Renovation And Modernization Of The Leipzig Cultural Centers Auditorium Together With The Reactivation Of Modern Digital Cinema. The Premises Subject To The Reconstruction Is: Net Area: 458.39 M2, Kubatura 2 336.40 M3. The Scope Of The Order Includes: 1) Construction Works: - Dismantling And Securing Devices - Disassembly Of Seats For Viewers - Dismantling Of Suspended Ceilings - Replacement For New Internal And External Doors And Windows - Dismantling Of All Wall Paneling And Wooden Elements - Dismantling Of Installations Intended For Renovation Or Liquidation - Scraping Or Washing Of Old Paint From Walls And Ceiling Protection Of Steel Elements And Installations For Adequate Fire Resistance - Replacement Of Door Lintels - Replacement Of Flooring Layers Of Floors, Including New Screeds At The Stage - Making Holes For The Introduction Of Installations And Expanding Existing - Injection Of Rooms In The Basement - Renovation Of Plasters On Walls And Ceilings (Supplementation) - Putting The Irregularities Of Walls And Ceilings - Plastering With Primary Supplements Of Cement -Lime Plasters On Walls And Ceilings - Plaster Coat Position - Wall Painting - Platelet Arrangement - Performing The Necessary Repairs Of All Damage Resulting During Works - Assembly Of The Floor Structure Raised At The Stage - Assembly Of Acoustic Systems On Walls And Ceilings - Assembly Of Scene Mechanics - Assembly Of New Lighting - Assembly Floors - New Seats Assembly - 328 Pcs. 2) Water And Sewage System. (Construction Of A Floor Grille In A Fan For Discharge Of Condensate From The Ventilation Unit. Replacement Of The Internal Hydrant In The Auditorium, Assembly Of Air Curtains) 3) Central Heating Installation. (Renovation Of The Installation Within The Auditorium Related To The Replacement Of Radiators) 4) Installation Of Mechanical Ventilation And Air Conditioning (Renovation Of The Current Course Of Ventilation Channels With Adaptation To The Assumed Number Of People In The Auditorium. Making Additional Lifts In The Floor And A New Distribution Of Windows In The Ceiling. Replacement Of Attic Devices For A New Headquarters. Fan). I.E. Ssp Fire Signaling Installation, I.E. Cp Headquarters, Fire Detectors, Optical And Acoustic Signaling Devices, Manual Fire Warning, Control And Control Elements, 7) Technological Installations Related To The Functioning Of The Scene: (Electroacoustic, Multimedia, Stage Lighting, Scene Mechanics) A) Acoustic Adaptation Covering The Selection And Distribution Of Materials Sound -Absorbing To Obtain The Best Acoustic Conditions B) Electroacoustics, I.E. Main System - Publication Of The Audience, Spatial And Cinema Sound System, Stage Listening System, Digital Sound Mixing System, Digital Wireless Microphone Systems, Wireless Listening Systems Iem, Registration, Sound Play And Control Systems, Vocal Microphones, Vocal Microphones, Vocal Microphones, Vocal Mic
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.