4.1. The Subject Of This Order Is The Fumigation Of The Church. Saint. Paraskewy In The Church Complex In Nowy Brużno - Branch Of The Kresów Museum In Lubaczów. In The Years 2014–2018, Conservation Works Were Carried Out. As A Result Of Transformations, The Building Took The Form From The End Of The 19Th Century. During The Work, Only Partial Work In The Field Of Wood Impregnation Was Carried Out, And Now, The Technical Condition Of The Structural Elements Is Deteriorating From Year To Year, Which Is Why Works In The Field Of Comprehensive Disinfestation Of The Object Were Planned First. The Fumigation Of The Entire Object Should Be Carried Out Using Ph3 Phosphorus. The Procedure Should Be Performed At The Time Regime And The Conditions Of The Procedure By Specialized Contractors. The Procedure Should Be Performed In A Completely Isolated Environment, In A Completely Controlled Manner, In A Few To Several Days, Using Specialized Preparations With Elongated Gas Release Throughout The Entire Facility. The Work Should Be Done In Accordance With The Conservation Work Program, Developed By Dr Wioletta Brzezińska-Marjanowska, For Which The Decision Of The Podkarpackie Provincial Conservator Of Monuments Was Issued Of November 28, 2023, Irn-Ii.5142.7.18.2023.Mbb Sign, And A Program Of Conservation Work (Changing) By Daniel Tylka, For Whom The Decision Of The Podkarpackie Provincial Conservator Was Issued. Monuments (Amending) Of November 21, 2024, Sign Irn-Ii.5142.272.2024.Mbb, As Well As The Provisions Of The Contract. The Works Will Be Carried Out At The Facility Located On The Plot Plot. No. 365, Entered In The Register Of Immovable Monuments Of The Podkarpackie Voivodeship Under The Number A-223 Of June 12, 1987. The Surroundings Of The Facility Are Constantly Sharing For Visitors, Therefore Fumigation Works Should Be Carried Out And Secured In Such A Way As To Impede The Functioning Of The Church Complex, Safe Movement In The Surroundings Of The Facility, Both Employees And Other Users Proper Level Of Monument Safety. 4.1.1. The Contractor Will Be Obliged To Perform The Subject Of The Contract From Own Materials And In Accordance With The Provisions Of This Specification Of The Contract Terms, Provisions Of The Submitted Offer, Conservation Documentation And The Requirements Arising From Applicable Law, Standards And Norms, As Well As Professional Ethics And Established Customs, With Due Diligence, Using Traditional Techniques, With Full Respect Of Preserved, Original Materials And Historical Layers, Own Forces Or Own, In The General Contracting System. 4.1.2. The Contractor Bears Full Responsibility For The Loss, Destruction Or Damage Of The Objects Issued To Him By The Ordering Party To Carry Out Conservation Activities And If These Circumstances Will Be The Result Of Incorrect Performance Of The Benefit - On The Principles Set Out In The Contract. 4.1.3. The Contracting Authority Requires The Contractor To Have Liability Insurance During The Per
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.