1 Jerzy Dunin -Borkowski In Krośniewice - Execution Of Design Works And Construction Works, Is The Implementation Of Complete Design Documentation (In Accordance With The Requirements Specified In The Functional And Utility Program - Annex 1A To Swz) And Agreeing It With The Voivodship Conservator Of Monuments And The Ordering Party, And Then Based On Its Basis Renovation And Construction Works Related To The Thermo -Modernization Of Buildings Of The Museum. Jerzy Dunin-Borkowski In Krośniewice Along With The Placement Of An Information Board Regarding The Source Of Investment Financing In The Area Where Construction Works Will Be Carried Out. The Scope Of Construction Works Includes In Particular: Partial Insulation Of Buildings Together With A Change Of Heat Source And The Necessary Infrastructure, Replacement Of Window And Door Joinery And Other Renovation And Construction Works. The Implementation Of This Part Of The Order Will Take Place In Two Stages: A) Stage 1 - Design Documentation; B) Stage 2 - Construction Works; 2. A Detailed Description Of The Subject Of The Contract For Parts And Contract - Construction Of Renovation And Construction Works Related To Thermomodernization Of The Buildings Of The Museum Jerzy Dunin -Borkowski In Krośniewice - Execution Of Design Works And Construction Works, Constitute: A) Functional And Utility Program - Annex 1A To Swz; Together With Attachments Constituting An Integral Part Of Pfu: ˗ Annex 1 To Pfu - Construction Design Of An Additional Exit In Accordance With Fire Requirements Together With A Driveway For The Disabled; Together With Permission To Carry Out Construction Works At The Monument Entered In The Register Of Monuments No. Wuoz-Zn.5142.594.2024.Ib Of 23.07.2024 Issued By The Łódź Provincial Conservator Of Monuments And With Decision No. 401/2024 Granting Building Permits Of 18.09.2024 Issued By The Kutno Starost; Pfu-Guidelines Of The Provincial Office For The Protection Of Monuments In Łódź (Sign Of Wuoz-Zn Scriptures, 5183.460.2024.Ch) Of 21.05.2024 In Terms Of The Concept Of Thermomodernization And Renovation Of The Former Inn And The Carrier In Krośniewice, Currently As The Museum Of Jerzy Dunin-Borkowski; B) Energy Audit-Annex 1B To Swz; C) Inventory-Annex No. 1C To Swz; D) Concept-Annex No. 1D To Swz; E) Draft Contract-Annex 5A To Swz.3. The Warranty And Warranty For The Disadvantages: 1) The Contracting Authority Requires The Contractor To Be Granted For The Design Documentation, Completed Construction, Installation And Assembly Works, Completed Installations, Delivered And Installed Devices, Built -In Materials And The Supplied And Installed Information Board Of The Warranty And Warranty For The Period For A Period Of Minimum 36 Months From The Date Of The Final Acceptance Of The Works. And The Warranty For Defects Will Result From The Contractors Offer). 2) The Warranty And Warranty Are Covered By All Elements Made By The Contractor As Part Of The Performance Of The Contract, In Pa
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.