GTR 96726788
Tenders Are Invited For Niek 2025 Osiedle Zielona Górka: Lighting Construction At Ul. Czereśniowa In Olsztyn - Stage 1 And 2
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
96726788
Tendering Authority
Subscribe to view
Tender No
NZ.2510.25.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Niek 2025 Osiedle Zielona Górka: Lighting Construction At Ul. Czereśniowa In Olsztyn - Stage 1 And 2
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
02-06-2025
Closed
Work Detail
The Subject Of The Order Is The Construction Of New Street Lighting Along Ul. Czereśniowa In Olsztyn. The Lighting Will Be Powered From The Existing Lantern Located In Ul. Wiśniowa. The Designed Lighting Will Be Powered As Part Of The Existing Connection Power-From The Existing So-077 Morva Lighting Wardrobe. Five Columns Should Be Placed On Prefabricated Foundations Dedicated By The Selected Manufacturer, And One Pole Should Be Found Without A Foundation (Hammered/ Dug Into The Ground). The Poles Are Designed To Install Light Points Realized By Means Of Energy -Saving Led Road Firing With Motion Sensors Ensuring Lighting Work In The Follow -Up Mode. Luminaires Equipped With Zhaga And Nema Sockets. Street Lighting Is Designed On The Basis Of Aluminum Columns Of Gray Anodized With A Height Of 7M With Single Booms With A Length Of 1.0M And Without Booms. The Height Of Suspension Of Street Lighting Fittings 7M. The Stems Of Columns For The Door Must Be Secured With Elastomer. Piles And Booms Secured With Anodic Anodic Technology With Anodic Coating In The Range Of 20 To 25 Microns. The Poles Should Have Declarations Of Functional Properties Signed With The Ce Mark Issued By The Manufacturer. The Minimum Period Of Manufacturers Warranty For 5 Years With The Possibility Of Extending To 20 Years. Setting Energa Lighting In The Amount Of 3 Pcs At Ul. Czereśniowa 1-5 Should Be Dismantled And The Lighting To Energas Resource Should Be Taken. The Ace Of This Procedure Is To Receive Construction Works Of The Quality Specified In Swz. For These Reasons, The Employer Has Made Due Diligence So That The Subject Of The Contract Is Not Described By Indicating Trademarks, Patents Or Origin, Source Or A Special Process That Could Lead To The Privilege Or Elimination Of Some Contractors Or Products. If, Despite This, It Turns Out That In Any Place Swz And The Attachments There Are Such Indications To It, They Should Not Be Treated As Requirements Related To The Subject Of The Contract, And They Should Be Considered Only In Terms Of Information Indications (Not Connected With Contractors). The Setting Description Of The Subject Of The Contract Is Included In Annex 4 To Swz (Project Documentation And Technical Specification). Public Road Section Ul. Czereśniowa Along With Lighting And Rainwater Sewage System Was Issued Decision No. Ii-59/2025 Of 03/03/2025 On A Building Permit. According To The Building Permit, The Construction Manager Should Be Appointed.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
04f75ba7-5379-4ad9-a017-1283f86cd2d2.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.