1. The Subject Of The Contract Is An Investment Task Consisting In The Implementation Of Project Documentation And The Implementation Of Construction Works Related To The Implementation Of Mechanical Ventilation Installation In The Gym And Mechanical Ventilation Installation Along With The Air Conditioning Installation In The Teachers Room (Meeting Room / Conference Room) In The Building Of Primary School No. 3 Walery Wróblewski In Sokółka. The Functional And Utility Program With Attachments Specifies All Requirements For The Implementation Of Project Documentation, As Well As The Implementation Of Construction Works In The Design And Build System .2. The Order Includes The Design Part: Preparation Of Construction Projects, Preparing Technical Projects. Preparation Of: Technical Specifications For The Performance And Acceptance Of Works, Preparing Bill Of Quantities And Investor Cost Estimates, Developing Information On Safety And Health Protection, Preparing A Project Of Permanent Traffic Organization And Traffic Organization For The Duration Of Works. If The Collision Is Needed To Remove The Collision, They Must Be Included In The Design Documentation Developed Or Introduced To It At The Executive Stage. 3. Development Of Other Materials Necessary To Obtain The Necessary Opinions And Decisions At The Stage Of Preparing Documentation, Among Others Materials For Arrangements With Rdoś And Polish Waters, Materials For The Environmental Decision, Water Law Permit And Other Necessary Studies Required By Law - If Required. 4. After Developing The Documentation, Obtaining In Consultation With The Employer Notifying The Intention To Carry Out Construction Works/Building Permits - If Required.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.