In Dortmund Hörde, Additional Living Space Is To Be Created In Various Construction Phases. The Three Point Houses On Stettiner Straße Are A Part Of This. The Development Plan Hö 273 (July 16, 2021) Applies To The Area. To The Northwest, The Property Borders On A Green Area That Extends North To The Konrad From The Mark School To The Allotment Garden. To Create A Transition From The Closed Construction Of The Adjacent Residential Area To The Green Area, The B Plan On The Property Provides For Three Point Houses, Two Of Which Are In The Same Size. The B-Plan Provides For A Maximum Height Of The Full Floors Of 9.00M. In Coordination With The City Planning Office, The Specifications Are Deviated From The Requirements And The Buildings Are Built Up To One Meter Higher. As A Result, An Appropriate Room Height Can Be Achieved And The Buildings To Protect Against Flooding Can Be Increased Slightly. In Terms Of The Parking Space Statute, An Underground Car Park Is Provided On The Property. The Buildings Are Certified Qng And Are Planned In Wood-Hybrid Construction. It Is A Reinforced Concrete Skeleton Structure In The Outer Facade, A Massive Core With An Elevator And Staircase, As Well As Massive Apartment Partitions. The Facade Is Planned As A Prefabricated Wooden Frame Construction, So That They Can Be Delivered To The Construction Site In A High Degree Of Prefabrication. The Entire Attic Is Built In Wooden Construction. 44 Residential Units Are Planned In Different Sizes. A Focus Is On Larger Apartments For Families. 40% Of The Areas Are Intended For The Subsidized Housing. Due To The Specified Cubature, There Are Interior Rooms That Are Used For Storage Rooms And Bathrooms. Most Of The Apartments Extend Over Two Facade Sides, So That Sunlight Falls Into The Apartments Over The Course Of The Day At Different Times. The Rooms Between The Buildings Are Partially Private, For The Most Part As A Common Green Spaces To Create A Meeting Place For The Residents. A Green Roof And The Use Of Pv Systems Are Provided According To The Requirements Of The City Of Dortmund. According To The Current Status, The Connection To A Local Heating Network Still To Be Created Is Planned.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.