Tenders Are Invited For Construction Of A Sewage Treatment Plant With A Sanitary Sewage System In Miały (Development Of Project Documentation)

Tender Detail

96674139
KTI.271.4.2025
Self-Funded
Tenders Are Invited For Construction Of A Sewage Treatment Plant With A Sanitary Sewage System In Miały (Development Of Project Documentation)
NCB
central europe
European Union
11-06-2025

Work Detail

The Subject Of The Order Is The Development Of Project Documentation For The Investment Task: Construction Of A Sewage Treatment Plant Together With A Sanitary Sewage System In Miałach, Including: The Scope Of The Order Includes: Task No. 1: Development Of Project And Costing Documentation For: Construction Of Sewage Treatment Plants In The Small And Construction Of A Sanitary Sewage System Receiving Sewage From Buildings Located In The Village Had. The Sewage Treatment Plant Must Ensure The Collection Of Sewage From The Village. In The Scope Of Design Study, The Location Within The Sewage Treatment Plant For Sewage Sewage Providing Sewage Collection From The Village: Mężyk, Biała And Hamrzysko Should Be Foreseen. The Location Of The Designed Sewage Treatment Plants Within The Plot Must Ensure The Possibility Of Expanding The Sewage Treatment Plant In The Next Stage Of The Task, Which Will Allow Sewage Collection Through A Sanitary Sewage System From The Villages Of Biała And Mężyk. The Design Of The Sanitary Sewage System Must Ensure The Collection Of Sewage From The Properties Located In The Small, Including Within The Following Streets: Fabryczna, Brzozowa, Leśna, Mężykowska, Powstańców Wielkopolskie, Dworców, Leśny Echo, Rzeczna, Kręta, Nowa, Wroniecka, Sierakowska, Drzymały, Os. Summer. Preliminary- Proposed Course Of The Sewage Network Was Indicated On Illustrative Maps Constituting An Attachment To Swz. Estimated Length Of The Designed Sanitary Sewage Network: 6.25 Km. As Part Of The Design Study, The Equipment Of The Sanitary Sewage Network With Pumping Stations, Compressions And Other Weapons Elements Enabling The Rafting Of Sewage To The Designed Sewage Treatment Plant Should Be Foreseen. The Network Length May Differ From The Above-Adopted By Approx. +- 15%. The Contracting Authority Reserves The Right To Increase The Abovementioned Length By Approx. 15%. The Design Must Include A Sewage Network With Connections To Built -Up Properties. In The Case Of Undeveloped Properties, Either In The Event Of Not Obtaining The Consent Of The Owner Of The Property To Design A Connection Within A Given Property, A Connection Ended With A Sewage Well Located At The Property Border Should Be Designed. The Contracting Authority Requires The Design Of Connections After Consulting With The Owners Of Inhabited Plots And Obtaining Written Consents From Them. In The Absence Of The Location (After Attempting To Contact The Owner), The Location Of The Connection Is Determined By The Designer On Conditions Obtained From The Entities With Land, E.G. State Forests, Provincial Roads, Poviat Roads, Pkp, Etc. The Sewage Treatment Plant Project Must Ensure The Reception Of Sewage Led To The Treatment Plant Using The Designed Sewage Network From The Village And The Possibility Catchment (Constituting Part Of The Project For Designing As Part Of This Procedure) Sewage Delivered From The Village: Mężyk, Biała And Hamrzysko. The Planned Sewage Treatment Plant Should Be

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail