The Subject Of The Contract Is Current Maintenance And Maintenance Of Existing Streets Of Municipal Streets In The City Of Gniezno. The Scope Of The Subject Of The Contract Includes, In Particular, The Performance Of: A) Renovation Of The Crushed Surface With Condensation Of The Cationic Emulsion, Rapid -Modified, With Asphalt Content Min. 65% Above 2 Cm Deep, In The Amount- 1900 M2- Accusing Or Cutting Off The Damaged Place Of Irregular Shapes,- Removal Of Loose Material, Cleansing The Potholes Of Pollutants And Dusty Parts,- Filling The Defect With Hard Crushing With A Grain Of 0-63 Mm, Chasing The Roller, Hacking, Re-Teller, Cationic -Speed Modified Cationa With Grits 0-5 Mm, B) Renovation Of The Criminal Surface Without Sprinkling, In Quantity - 1000 M2 - Accusing Or Cutting Off A Damaged Place Of Irregular Shapes And Vertical Edges, - Removal Of Loose Material, Cleaning The Pothoa Of Pollution And Dusty Parts, Graining 0-63Mm, Charging, Enchantment With Pouring Water, - Re -Entitled With Peeling, C) Mechanical Arrangement Of 10 Cm Thick Layer Of Concrete Crushed Stone Or Similar Hardness, Annexed With A Grainage Of 0-63 Mm, In The Quantity - 700 M2 - Mechanical Profiling Of The Substrate With A Equation, - Laying The Crushed And Charging With A Small Age. Grys - Gr. Layers 10 Cm After The Charm, D) Laying Of A Bituminous Destruct Layer With A Thickness Of 10 Cm And Inquiry- 400 M2, E) Renovation Of The Crushed Surface With Cavities With High Density Intended For Ally, In The Quantity- 2100 M2- Mechanical Breaking And Discharge Of Damaged Surfaces With A Balance From The Equator,- Reprification Of The Spoil, (Loose Material) And Performing Equal Surfaces With The Surface Of The Surface And Transverse Declines, Renovation Of The Criminal Surface With Condensation Of Cationic Emulsion, High -Speed Modified, With Asphalt Content Min. 65% To 2 Cm Deep, In The Quantity - 1000 M2 Above The Quantities Are Estimated And May Change During The Work. For The Performance Of Works That Are Not Included In The Above List Should Be Given In Annex 2 In The Price Form, The Unit Prices Included In The Calculation Of The Cost Estimate: I.E. Man -Hour Rate, Indirect Costs, Purchase, Profit, Profit And Price For Removal Of Materials From Demolition.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.