1.1 The Subject Of The Contract Is: Execution Of Construction Works In The Building Of School Workshops Belonging To The Technical School Complex In Mikołów As Part Of The Project Effective Functional Schools - Development Of Vocational Education In The Mikołów Poviat Co -Financed By The European Union Under The European Funds Program For Silesia 2021 - 2027 (Priority Fesl.10: European Funds For Transformation, Action Fesl.10.14: Infrastructure Of Vocational Education). 1.2. The Subject Of The Contract Includes The Following Scopes Of Works: Scope 1: Reconstruction Of Electrical Laboratories - Rooms No. 409 And 409A And Saltrobotics No. 310. Zakres 2: Reconstruction Of Car Workshops - Rooms No. 302, 303, 304 And 305.1.4 Under The Scope Of 1 Subject Of The Contract, The Following Works Enter In Particular. Disassembly And Demolition, • Disassembly Of The Sink, • Disassembly Of Linoleum Liner In The Rooms, • Dismantling Of Existing Lighting. G-K In The Back Room, • Installation Of The 300X420cm Zone From A Small Mesh, H = 200Cm With A Key Door With An Electric Lock • Installation Of The Sink In The Back Room, • Assembly Of New Lighting, • Modernization Of Ventilation Installations, • Painting Walls And Ceilings. G-K, • Installation Of The Lintel With Doors To Room No. 409A, • Replacement Of The Existing Door To Room 409, • Installation Of Pvc Floor Covering In The Rooms, • Painting Walls And Ceilings, • Execution Of A New Room Ventilation Installation, • Assembly Of New Lighting.1.5 As Part Of The Scope Of 2 Of The Subject Of The Order, In Particular, The Following Works Are: Entrance, • Disassembly Of Sliding Doors To The Workshop, • Disassembly Of Existing Lighting, • Disassembly Of The Existing Lamperia, • Disassembly Of Existing Ventilation, • Disassembly Of Radiators, • Demolition Of Existing Lifts Foundations, • Floor Demolition, • Dismantling Of The Washbasin, • Dismantling Of Tile Cladding, • Dismantling Of The Existing Foundations Lifts. Concrete On The Ground, • Installation Of The Sink, • Assembly Of Radiators, • Performing The Foundation For Devices: Lifts, Paint Shop, • Dehydration Of The Floor, • Painting Of Walls And Ceiling, • Securing The Flat Roof From Below Along The Wall Between The Room, • On The Facade In The Places Of Bricklaying Of The Window And Gates, Use Mineral Wools. Papa Covers For Felt Nro: Broof T1 (Non -Spreading Fire) Along The Wall Between The 305 And 303. 1.6. The Lrv Contrast Factor (Light Reflection Factor) And To Present The Results Confirming Compliance With The Available School, 1.7. Annexes, Including The Planned Provisions Of The Contract. (Guidelines For The Implementation Of Equality Principles Under Eu Funds For 2021-2027 - Annex 2 To The Guidelines In The Field Of Availability Standards For Cohesion Policy For Years 2021-2027) Https://Www.Funduszeeuropejskie.Gov.Pl/Stroni/O-Funduszach/Dokumenty/Wytyczne-Dotyczace-Realizacje-Zadzoad-Rownoscowy-W-Ramach-Funduszy-Ujni -U-Na-Lata-2021-2027-1/