4.1. The Subject Of The Contract Is Construction Works Carried Out As Part Of The Investment Task Entitled Construction Of Municipal Road No. 103286 L In Siedliska. 4.2. The Scope Of The Subject Of The Contract Includes The Construction Of A Section Of Municipal Road No. 103286 L On Road Plot No. 39 In The Town Of Siedliska With A Bituminous Surface Of About 365 M, Width 3.50 M With Bilateral Roadside From A Stone Aggregate With A Width Of 0.75 M With One Passing Road Lane, As Well As Inclusion In The Poviat Road No. 1541 L And Mounting Vertical Marking. Construction Of The Surface: Road And Passing 0.45 Kg/M2; 5 Cm Ac16w Kr1 Asphalt Binding Layer Using 50/70 Asphalt; Quin -Dowel Interferatory Condensation C 60 B 3 Asphalt Emulsion In 0.8 Kg/M2; 20 Cm Basic Foundation From A Mixture Not Related To C90/3 Aggregate With A Grain Of 0/31; 30 Cm Layer Of Improved Substrate From A Mixture Associated With Cement C1.5/2; Native Soil; Conventions: 20 Cm Surface Made Of Broken Aggregate Mechanically Grazing 0-31.5; Native Ground; Roadside: 15 Cm Surface Made Of Broken Aggregate Mechanically Stabilized With A Grain Of 0-31.5; Native Ground. 4.4. A Detailed Description Of The Subject Of The Contract Can Be Found In Annex 1 To Swz, Which Consists Of The Following Documents: 1) Project Documentation, Including: A) Construction Project, Including: Land Development Project (Pzt); Architectural And Construction Project (Pab) Together With Attachments; B) Technical Projects (Pt): Road Industry, C) Executive Projects (Pw): Architectural Industry, Construction Industry; D) A Permanent Traffic Organization Project; 2) Technical Specification Of Construction And Acceptance Of Construction Works (Stwiorb); 3) The Bill Of Quantities, Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Flat -Rate Nature, The Contractor Should Be Based On The Scope Indicated In The Design Documentation Referred To In Point 4.4.1) And Stwiorb. The Bill Of Quantities Is Auxiliary. Speeching During The Implementation Of The Contract Not Included In The Pre -City Or Works In A Larger Amount In Relation To The Pre -City Adopted In The Pre -City Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Project Documentation Referred To In Point 4.4 1) And Stwirb.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.