Building Constructions Work - M4 Small Newspaper Engineering Building. M4 Expressway Kisújszállás Engineering Site Construction Work With The Following Mainly Estimated Quantities: New Engineering Plant To Be Established With A Total Of About 8882 M2 Of Buildings, Their Structure Engineering Work, According To The Following And The Available Construction Plan: - Office And Social Building: 2053 M2 - Workshop: Cold Warehouse Building: 2193 M2 - Salt Storage Building: 1713 M2 Interior Covering (Asphalt, Paving Stone, Concrete): 6400 M2 Solar Panel Power Plant: 60 Kwp 230 M Sole Water Supply 220 M3 Sewage Collection Construction Of A New Road Leading To Engineering Engineering 479 M, External Parking Lots 70+3Pcs. The Engineering Site, Which Is Implemented Under This Investment, Will Be Responsible For Operating The M4 Expressway, Which Is Currently Under Construction, To Operate The Törökszentmiklós - Kisújszállás Section. The Operating Communications Network Is Implemented During The Construction Of The Expressway Section, Connecting To Péters Existing Engineering. The Preparation Of System Technology And Other Necessary Plans For The Relocation Of The Ühk Center And The Implementation Of It Is Also A Construction Task. The Contracting Authority Emphasizes That If The Clear And Clear Definition Of The Subject Of The Procurement Made It Necessary To Refer To A Specific Product, Type, Procedure, Procedure, Activity, Person, Patent Or Trademark, The Name Was Only For A Clear Definition Of The Nature Of The Object And Is Always Referred To. The Contracting Authority Draws Attention To The Fact That, In The Case Of Offering An Equivalent, The Tenderer Must Prove The Equivalence In His Tender. Detailed Quantities And Tasks Are Included In Public Procurement Documents.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.