In The Course Of The Implementation Of The Veloroute 2, The Individual Measures Are To Be Implemented 1.2.3 And 4 In This Package. Record 641 Mbordsteine U. Departure Record 49 M² Gosses And Departure 2174 M² Plate, Pavement Coverings And Departure 2585M² -Bitum. Record Traffic Space And Departure 2173 M² Loaded Bitum. Record Traffic Area Loosen 3076 M³ Of M³, Load, Departure Loosen 435 M³ Of Soil, Removal By Ag Deliver And Set 2146Mbeton Brothstones Deliver And Set 54M² Gosses 2170 Tfrost Protection Gravel Deliver U. 3280 Tschotter Deliver U. Install Deliver And Incorporate 6172 M² Aspent Layer Deliver And Install 9350 M² Deck Layer 3395M² Plaster And Deliver Plates Set 2Stk.Strasse Sequences
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.