Tenders Are Invited For Construction Work-Design, Execution Of Construction And Exercise Of Copyright Supervision During The Construction Of The Residential Building Fund Of The Association Of Owners Svishtov, 1 A Atanasovich Str.
Tenders Are Invited For Construction Work-Design, Execution Of Construction And Exercise Of Copyright Supervision During The Construction Of The Residential Building Fund Of The Association Of Owners Svishtov, 1 A Atanasovich Str.
Construction Work-Design, Execution Of Construction And Exercise Of Copyright Supervision During The Construction Of The Residential Building Fund Of The Association Of Owners Svishtov, 1 A Atanasovich Str.. 1. Subject Of The Public Procurement: Design, Execution Of Construction And Exercise Of Copyright Supervision During The Construction Of The Residential Building Fund Of The Association Of Owners Svishtov, 1 A Atanasovich Str. 2. Description Of The Subject Of The Public Procurement: The Subject Of The Contract Includes The Following Activities: 2.1. Development Of An Investment Project In The Working Project Phase For The Implementation Of The Most Efficient Package Of Energy-Saving Measures For The Building, Which Achieves A Minimum Class Of Energy And The Power Supply And An Accessible Environment In The Building Of People With Difficult Movement In Accordance With The Requirements Of Ordinance No. Rd-02-20-2 Of 26.01.2021 For Determining The Requirements For Accessibility And Universal Design Of The Elements Of The Accessible Environment In The Urban Territory And The Buildings And Facilities Of The Multi-Family Residential Building. Of Authorization During The Execution Of The Construction And Assembly Works In Accordance With The Requirements Of Art. Energy Saving C1: Thermal Insulation Of Walls - The Measure Involves The Application Of Thermal Insulation By Eps With A Thickness Of 120 Or 70 Mm And Λ = 0.035 W/Mk And Turning Around The Windows With 20 Mm Xps With Λ = 0.03 W/Mk - 351,99 M2. Mineral Wool Thermal Insulation With A Thickness Of 100 Mm And Λ = 0.035 W/Mk For The Roof Type 1 And The Thermal Insulation Of Xps With A Thickness Of 100 Mm And Λ = 0.03 W/Mk For The Roof Type 2 - 198.53 M2 - The Heating Of The Energy Savings. Λ = 0.03 W/Mk On The Walls Of The Basement Above The Level Of The Terrain - 108.56 M2 And The Replacement Of Windows And Garage Doors. Efficiency) With A Pvc Frame With A Maximum Heat Transition Coefficient U = 1.4 W/M².K -75,84 M2 Access For People With Difficulty Moving - Execution Of The Construction Works To Improve Access For People With Difficulty Moving To The Entrance Doors Of The 1 Block Section.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.