Waste Disposal Site Construction Work - Construction Of Dike # 2 And No. 3 Of The Cage # 3 Of The Sadina Depot. Construction Of Dike №2 And №3 Of Cell №3 Of The Depot Sadinna Stages Of Construction And Types Of Construction Works: 1. Reclamation Of The Dike №1 In Cell №3 -Application Of Earthly Re -Reclamation Layer Partially 0.30M. On The External Slope Of The Dike And On The Area From The Fifth Dike # 1 To The Road Ditch. 2. Construction Of A Dike №2 In Cell №3, Connection With The Built In Cell №2 Dike2. - Base Preparation - Arrangement With The Geomet In Detail; - Construction Of A Dike №2 - Laying Of Drainage - Hydro -Insulation Package On The Internal And External Slope Of The Dike №2 - Connection Of Hdpe Foil With That From The Dike №1 According To The Technology Given In The Technical Specifications; - Laying Of An Earth Layer 0.30M. On The External Slope Of The Dike # 2 3. Construction Of The Dike №3 In Cell №3 Reclamation At This Level Depends Entirely On The Rate Of Filling Of Cells With Waste From The Mbt Plant. Upon Reaching The Elevation Of 1.0M Below The Crown Of The Dike №2, The Preparatory Activities Must Be Launched. The Sequence Of Work Is As With The Dike №2. - Base Preparation - Arrangement With The Geomet In Detail; - Construction Of A Dike №3 - Laying Of Drainage - Hydro -Insulation Package On The Internal And External Slope Of The Dike №3 - Connection Of Hdpe Foil With That From The Dike №2 According To The Technology Given In The Technical Specifications; - Laying Of Earthly Reclamation Layer Partially 0.30M.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.